Laserfiche WebLink
I <br />EG 10-03-2012WED> 11:23 <br />G.R. KG-1 <br />0CT751 <br />PERHIT NB1210002 <br />Err 1. PIC <br />$208.81 <br />(425) 257-8810 <br />n oas <br />CLAD <br />f1 <br />Plan Check No.: <br />C1210-002 <br />Application Date: <br />10/3/2012 <br />Tenant: <br />BETHEL CHURCH <br />Owner: <br />SLAVIC PENTECOSTAL CHURCH B <br />Job Address: <br />7505 HARDESON RD <br />Proposed Use: <br />CHURCH <br />Description of Work: <br />TI-BETHEL CHURCH <br />Plan Check Fee Paid: <br />$208.81 <br />The building pennit application for the above -referenced project is being conditionally accepted I'or filing <br />pending the determination of its completeness. <br />If the City review determines that any additional land use approval or any additional infonnation is <br />required to complete your building pennit application, it will be necessary to submit this additional <br />infonnation or acquire the additional land use approval prior to your application being considered complete <br />for filing. If no other land use approval or additional information is required, your building permit <br />application will be considered filed as of this date. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />1 <br />Sinnalure <br />Date <br />FILE COPY <br />