Laserfiche WebLink
C <br />CITY OF EVERETT <br />BUILDING DIVISION <br />3200 CEDAR STREET <br />EVERETT WA 98201 <br />(206)259.8810 <br />CITY OF EVERETT <br />CONSTRUCTION PERMIT SUBMITTAL CHECKLIST <br />FOR: <br />NEW COMMERCIAL, INDUSTRIAL AND <br />MULTI-FAMILTY (GREATER THAN 2 UNITS) PROJECTS <br />Ic' <br />Land use reviews (SEPA, etc.) if required, must be completed prior to construction permit <br />submittal. <br />Complete checklist in ink. Fees: The plan check fee is due when permit application is made; <br />the permit fees are paid when the permit is issued. This checklist must accompany a <br />completed permit application. <br />fflo-luff FM Ump wism 15 <br />A. Use of building <br />Use (i.e. restaurant, office, etc.) D �� <br />B. Construction materials within building (wood, steel, concrete, etc.) <br />S64* <br />C. Indicate if the building will be equipped with an automatic fire suppression <br />systenh (fire sprinkler system). Please refer to City of Everett Ordinance No. <br />1909-92. <br />Yes <br />No <br />Partial <br />Describe below any other information which may assist the plans reviewer in processing the <br />permit application. <br />■•o«.a hm s0.1"s <br />