Laserfiche WebLink
The following is a Nat of the 1994 nonMM6rtaar oornPea"W Wu""' ` <br />Envelope <br />ENV -SUM Envelope Summary - Use Oft form for all projects where envelope work is to be done aSOW <br />rate versions for Climate Zone 1 and Zone 2. Show basic project informaton, complancs aptlorts <br />list of required Insulation levels and U-factors. Back side has Decision Fowchart for Prescriptive Option and calcu- <br />lation to datenni. grog weighted Hag Capactty for the Masonry Option. <br />ENV-CHK Building Permit Plans Checklist - Comprehensive list of all information required on plans for all op- <br />tions, Including the Component Performance and Systems Analysis Options. Also Includes space for building de- <br />partment notes. <br />ENV-UA Envelope UA Calculations- Use this form N using the Component Performance Option, he%aclr%paa-- <br />rate versions for Climate Zone 1 and Zone 2. Summary calrwlations of Target UA and Proposed <br />e has <br />calculation of Target and Proposed SHGC, and cslculation of glazing and opaque target area adjustments, N needed. <br />Mechanical <br />MECH-SUM Mechanical Swnmary - Use this form for all projects where mechanical work is to be done. Show ba- <br />sic project information, compliance approach chosen, list of basic equipment a effidend" (eta If" information <br />goes on equipment schedules on the plans). Beck side has Decision Flowchart for Simple System option. <br />ve list Of ON infOnnAtIon required on own for ON <br />options, including the <br />e Component Performancecal Permit rMeand S Analysis Options. Also includes space for building de- <br />paAment notes. <br />MECH-COMP Mechanical. Complex Systems - Use this forth if using the Complex Systems Option. Complex <br />Systems Checklist has additional Information required on plans for this Option. Decision flowchart is provided for <br />determining which Complex Systems requirements apply to the project. <br />MECH-MOT Electric Motors Checklist for electric motors compliance and schedule of installed motors, both for <br />mechanical systems and other equipment. <br />Lighting <br />LTGSUMM Lighting Summary - Use this forth for all projects where (puling work Is to be done. Basic project In- <br />formaton, compliance appEpach chosen, alteration exceptions. Calculations of Allowed and Proposed Lighting <br />Power for both Interior and Exterior Lighting if using theLighting <br />haPower Allow Power Allowance ance Option. Back side <br />eff as questions <br />to determine if project qualifies for the Prescriptive Option.Lighting <br />LTG-CHK Lighting Permit Plans Checklist - Comprehensive list of all information required on plans for all op- <br />tions, including Component Performance and Systems Analysis. Also includes space for building department notes. <br />