Laserfiche WebLink
PUBLIC WQRKS DEPARTMENT <br />COST ESTIMATE SHEET UTI TIES DIVISION <br />2300 CEDAR STREET <br />EVERETT, WASHINGTON 98201 <br />(206) 259-8800 <br />Receipt # -T-- Date Paid A::!i -Q,Q- <br />Cost of Work Order $ Work Order # <br />_ X Cost of Service Order $ 3.272 Service Order # _ <br />Requested By: _ Gordon Witcher Date of Request 10a <br />Property Owner (name) A & W Bottling r„ <br />Charge Cost to (name if different than owner) <br />Address 2817-ioo h er SW ver ,*-t State WA <br />Zip _ 98zoa <br />Installation Location _ 7500 Hardison Road <br />Installation type/description/size/etc. Tee off an fire line w *►+ �� <br />The all labor,quip equipment, materials, i eestimate u restoration,pon the <br />and final ho ties sk up providing <br />double check valve assembly for temporary service is availableofrom the <br />City's Permit Counter by requesting a Hydrant Use Permit with an <br />additional deposit. <br />Whenever the estimated cost is not sufficient to cover the total expense <br />for labor, material, equipment rental and administrative costs, the <br />deficit shall be charged to the property for which such installation was <br />made and the owner thereof, and provided further, that any excess <br />payment shall be returned to the person applying for the installation. <br />Itamised Cost Estimate: <br />Labor & Overhead 864 <br />Material 2,092 <br />Equipment Rental 11ia <br />Surface Restoration 100 <br />Service Order Cost 3.272 <br />Total 3,272 <br />Prepared by O Don We <br />cc: Susy Haugen <br />Don Weitkamp <br />Larry Crawford <br />Bob Chervenell <br />Clair Olivers <br />Carroll Tollefson <br />Revised 10/12/88 <br />