My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7701 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7701
>
7701 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 9:33:09 AM
Creation date
2/21/2017 12:20:32 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7701
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIO©G�4�Gz]QQD4 <br />LAND USE CONSULTANTS <br />M PLANNINO O [NOINf[gINO O sm"V[VINO <br />O •�) M[OIO YL-Of NT•L OLOO <br />•V[gfTT WN •[Y 11 [Of [f[f11f <br />November 27, 1978 <br />Mr. Gerry Ervine <br />City of Everett <br />City [fall <br />Everett, WA 98201 <br />Dear Gerry: <br />This letter is a letter of commitment and clarification <br />of several issues which we understand are necessary in <br />order to obtain City of Everett authorization for occupancy <br />of Westridge Mobile Home Park. <br />We understand that there are eleven additional trees which <br />should be planted. Three of those trees are in the area <br />originally designated as R.V. storage area and eight trees <br />will be in that area immediately north of the large evergreen <br />grouping located approximately in the middle of the site. <br />These plantings will be completed by December 8th. <br />The 131 American Sweetgums street trees which line the <br />interior streets will be planted after all mobile home <br />units are in place. This practice of course is necessary <br />in order to eliminate the conflict of the initial coach <br />installation. In addition, all trees and shrubs which die <br />during the first growing season will be replaced during the <br />fall planting period following this time. We also under- <br />stand that no coaches on lots 85 through lot 99 will be <br />sited until the roadway is paved for this portion of the <br />site. <br />Please issue an occupancy authorization subject to the con- <br />ditions and commitments which have been set forth by this <br />letter. If you have any further questions regarding this <br />objective, please contact our office. <br />Sincerely, <br />Gary D. Wight <br />GDW:llp (#411) <br />cc: Terry March <br />
The URL can be used to link to this page
Your browser does not support the video tag.