My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7720
>
BASE FILE
>
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:26:59 PM
Creation date
2/21/2017 12:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7720
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L�J <br />D <br />� <br />IJ <br />r <br />6. STRUCTURAL �4ASONRY: During preparation of masonry wall prisms, <br />samo ing an p acing of all masonry units, placement of reinforce- <br />ment, inspection of grout space, imanediately prior to closing of <br />cleanouts and during all grouting operations. Where the f'm is <br />less than 2600 psi and special inspection stresses are used, test <br />specimens may consist of either one prism for each 5000 square <br />feet of wall area or a series of tests based on both grout and <br />mortar for the first three ccnsecutive days and each third day <br />thereafter. <br />7. REINFORCED GYPSUM CONCRETE: Wh�n cast-in-place Class "B" gypsum <br />concrete is being mixed or plac�d. <br />8. INSULATING CONCRETE FILL: Durir,g tiie application of insulating <br />concrete fill when used as part of e siructural system. <br />9. SPRAYED-ON FIREPP,OOFIN6: As required by Uniform Building Code <br />Standard No. 43-8. <br />� 10. PILING, DRILLED PIERS AND CAISSONS: Durin9 driving and testing <br />of piles and construction of cast-in-place drilled piles or caissons. <br />See Iteins No. 1 and No. 3 for concrete and reinforcing steel <br />inspections. <br />\� 11. SPECIAL GRADIPIG, EXCAVATIOi! APlD FILLIN6: During earthwork, excava- <br />tions, grading and filling operations to satisfy the requirements <br />of Chapters 29 and ;0 (Appen�'i::) of the Uniform Building Code. <br />\/ 12. SPECIAL CASES: <br />., �� r;.,.��iirlc-. <br />All inspection reoorts must be filed promptly �•iith the Building Department as <br />the work progresses and at the completion of the project. Upon completion of <br />the special inspections a let,ter or other certification shall be filed with <br />the City of Everett Building Department listing 2ach type of inspection and <br />stating that the soecial insqections required viere completed in accordance with <br />the Uniform Buildin9 Code, current edition. <br />Confirmation of the authority to provide special ii;soections shoul� be obtained <br />from the owner or his/her authorized agent. <br />Very truly yours, <br />,- i � , _ <br />Kenneth W. Callznan <br />Duilding Director <br />City of Everett <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.