My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7720
>
BASE FILE
>
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:26:59 PM
Creation date
2/21/2017 12:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7720
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 16, 1981 <br />Neil Eshleman Building Company <br />Post Office Box 578 <br />Edmonds, Washington 98020 <br />SUBJECT: SEAPROP CORPORATION WAREHOUSE <br />7720 HARDESON <br />E'VC'C4'it <br />� .�-...... <br />� ,- � .,, _ <br />� � <br />t`. _ !'? <br />c�rr o. <br />�ver�tt <br />CITY HaIL • i59�BT�5 <br />EVERETT, W�SHIHGTON <br />BBNI <br />INSPECTION ItEPARTMENT <br />At our meeting held at the jebsite last Thursday, September lOth, <br />I asked if the drawings for the project which were approved by <br />our department were on the jobsite. Craig Eshleman responded that <br />they had them but were misplaced, or whatever, and currently they <br />were not on the jobsite. <br />Qecause of the numerous amount of changes and omissions since we <br />originally reviewed and approved the plans and specifications, we <br />will require that new plans and specifications indicating these <br />changes and omissions be submitted to us for our review and aoproval <br />before we remove the "Stop Work Order". We will require reasonable <br />time for plan review and an additional plan check fee, which we will <br />determine based upon Sections 304(b.) and Table 3-A of the Uniform <br />auilding Code. In my discussion with Ted Smith, your structural <br />engineer, this morning he indicated he was still working on toio of <br />the chan9es involved. <br />Sincerely, <br />j�� ��,��-- .�. <br />Kenneth W. Callahan <br />Ouilding Director <br />KWC:stg <br />C, <br />�,.� �,. �<<^._ <br />cc: R.I.A. Architects <br />Ballinger, Smith and Carson, Consultina Engineers <br />Doug audden, Chief Inspector <br />Wally Christopherson, Building Inspector <br />� <br />� <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.