Laserfiche WebLink
CIABED C![ ROR1C ORDERB RBPORT � <br />Total Utility Maintenance Management System <br />10/23/1997 Paqe 1 <br />x====��v===_=e=vvva=vvx=x�aaazxa=_====ee=es==�see=ass=cv=e'oe=_==cc�a:s:�z <br />Date Ranqe :01/09/1989 - 10/09/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101196751243 <br />Item Ranqe :<Blank> - WNI,3694L05 Pattern :* <br />Proqram 11LL Function ]►LL ]►ctivity ALL <br />_�__=�_—� ..��:�__ :��r===:=�__=====a=�=_____________________=___�_ <br />CM WORK ORDER �D: 7101196751243 Title: REPAIR 2205 HARRISON �{Vti <br />«DUPLICI►TE PRINTING OF THIS WORK ORDER» <br />Item ID: WS2195M018 -- WATER SERVICE <br />Location ID: -- <br />Proqram 710 Function 119 Activity 675 <br />Date Completed: 09/26/1997 <br />Overall Craft: <br />issued: 09/25/1997 Issued by: WMW Assiqned to: <br />out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Readinq: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />EO CCL <br />UL WTE <br />1[at�rial�: <br />ID <br />Name <br />------------------ <br />CRAIG, CHESTER L. <br />WESTVI�,NG, TERRY E. <br />Description <br />----------------------------- <br />ADAP34000147 1►D]�PTER 3/4" MIP X IPS RI @ <br />1�DAP34000547 ADIIPTER 3/4° MIP X'INSTA-TITE@ <br />ADAP34000647 �D1IPTER 3/4n FIP X INSTA-TITE@ <br />COUP3213'7647 COCPLING 1/2" COP X 3/4"MIP @ <br />ELL034104247 ELL 3/4" 90 DEG STREET BRASS ' <br />METE36089447 METER 5/8M X 3/4° NEPTUNE T-10 <br />PIPE34060647 PIPE 3/4" POLY I.P.S. <br />SETT34149747 SETTER COP 5/8" X 3/4" (H7") <br />vahicl�ss <br />ID Descriptiott <br />------------ ------------------------------ <br />VJ0026 �97 FORD 1 TON SVC TRUCK <br />Planned Hrs Actual Hrs <br />----------- ---------- <br />0.00 2.00 <br />0.00 2.00 <br />Total Labor Cost: <br />Date <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />09/25/1997 <br />Cost <br />39.44 <br />31.56 <br />71.00 <br />� Used Cost <br />1 <br />2 <br />2 <br />1 <br />1 <br />1 <br />2 <br />1 <br />Total Material Cost: <br />Hours <br />2.00 <br />Total Vehicle Cost: <br />work Description: <br />------------------------------------------------------- <br />METER �41508018 <br />Cost <br />11.80 <br />11.80 <br />2.51 <br />16.76 <br />15.30 <br />3.27 <br />1.51 <br />30.67 <br />0.40 <br />38.64 <br />109.06 <br />