My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2333 HARRISON AVE 2018-01-02 MF Import
>
Address Records
>
HARRISON AVE
>
2333
>
2333 HARRISON AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:03:43 AM
Creation date
2/21/2017 12:45:02 AM
Metadata
Fields
Template:
Address Document
Street Name
HARRISON AVE
Street Number
2333
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />, ur ,•: r.o.1007003 <br />OWNER ,.AME AND ADDRESS: <br />1 <br />8 <br />1 <br />HEA <br />FREDRICH MARK <br />i <br />15714 E SHARE DR <br />1 <br />DR <br />RIVE <br />LYNNWOOD WA 98087 <br />A <br />t <br />SEWER <br />PHONE: 4254789181 <br />mx n <br />AX PARCELID # 00602850901400 <br />TL <br />GAPT <br />DESCRIPTION OF PROPOSED WORK: <br />Date: <br />07/13/2010 <br />Public Works Permit#: <br />PW1007-007 <br />Buildinq Permit#; <br />C1007-0031 <br />Planninq Reference #: <br />Public Works Fee $: <br />Other $: <br />APPLICANT NAME AND ADDRESS: <br />b d.11J <br />$90.00 <br />$25.00 <br />1007018 <br />PHONE: <br />.SITE ADDRESS: 2333 HARRISON AVE <br />NEW HOUSE <br />UNION TRUST CO S 1ST ADD TO EVERETT BLK 509 D-00 - W1/2 OF S1/2 LOT 14 W1/2 LOT 15 & W1/2 LOT 16 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4 Connect side sewer per City Standard #'s 601. 602, 604. <br />5. Connect all rooftop downspouts to the side sewer. <br />6 The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to beginning <br />the project <br />7 Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br />swales, or erosion blankets. <br />8 Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />9. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br />No wasting of material is allowed on this building lot. <br />10. No dirt, mud, rocks or debris to be tracked onto roadway. <br />11. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for <br />pedestrian travel. <br />12. Adjust water meter box 1" above sidewalk grade. <br />13. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on this <br />proposal's frontage as directed by the Public Works Inspector (i.e, all unused driveways and any broken or <br />damaged area must be replaced). <br />14. Pave driveway from the front property line out to the street paving. <br />—ZZ— to <br />for <br />INSPEC ION i 1 Uale // C <br />ved as onslructed r <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />—IQSignature of Applicant <br />Date <br />WORK AUTHORIZEEdBY THIS PERMITMUST BE STATED W11 HIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.