Laserfiche WebLink
Work Activity Work Order Pace z <br />4/3/2013 14:56 <br />ISSUOd BY SJT2 SPOONER, JAMES T. <br />Issued Departmentaw PUBLICWORKS <br />Date Issued 2H212013 <br />Fund aot Account 5 Program Function Activity <br />Program u73a�3 2 3 <br />TItlB CONVERT .5 INCH 2412 HARR�SON AVE UT3473•2•3 <br />Work Order No 20130414 PfOJOC► Activiry Type CORRECTIVE t.1AINTENANCE $�81U5 CL <br />Status 2/12l2013 Time i5:za Original WO _ Billing <br />Problem Details <br />CONVERT.S INCH CURBSTOP TO .751NCH SETTER W/ METER AND <br />BOX. FLAT TO METER PROJECT. <br />Structure ID StiTvp Activi Comol Date Comments <br />WS2195N004 WASRVC YES 3l5/2013 _ <br />Address 2412 HARRISON AVE <br />Cross Street <br />Area Designator Structure Lecation <br />Map Reference 2412 HARRISON AVE <br />Location <br />Type Mater No <br />M ADAP34000647 <br />M ADAP34000547 <br />M BOX000154347 <br />M BUSH32700947 <br />M COUP34135447 <br />M ELL0341U4247 <br />M METE34141847 <br />M PIPE34060647 <br />M SETT34149747 <br />M _ NIPP32130947 <br />Type Na No <br />NA NIA <br />NA N!A <br />NA NIA <br />Material Costs <br />Description Quantity__ ___ Cost Billing Date _Billing Code Warehouse <br />ADAPTER 314 FIP X 3l4 IPS INSTA 2 30.104 03/OSI2013 PAN <br />ADAPTER 514 MIP X 3/4 IPS INSTA 2 31.08 03�05/2013 PAN <br />BOX METER MOLDED PiASTIC W/D� L 1 71.483 03/05l2013 PAN <br />BUSHING HEX 3i4 X 112 NPT BRASS 1 3.366 03I05f2013 PAN <br />COUPLING 3/4 MIP X V2 CTS PACK 1 �0.906 03I05/2013 PAN <br />ELBOW 3f4 NPT 90 DEG STREET BRA 2 9.964 03105/2013 PAN <br />METER 5!8 X 3/4 NEPiUNE WIE•COD 1 189.063 03105I2013 PAN <br />PIPE 3/4 POLY IPS 200 PSI SIDR7 2 .544 03�05/2013 PAN <br />SETTER COPPER 518 X 3l4 (HEIGHT 1 101.603 03/J5/2013 PAN <br />NIPPLE 1/2 NPT X CLOSE BRASS 7 2.195 0310G2013 PAN <br />— Total Material Cost 5aso.3o <br />NA Costs <br />Description ___ _ Quantity _ Cost Billing Dale Biliing Code Warehouse <br />� CLAMP 2 3.66 03I05f2013 <br />SAND .5 9.5 03f05':013 <br />TOPSOIL .5 9.01 03I05/2015 <br />Total NA Cost <br />Total Cost <br />522.17 <br />$4T2.47 <br />