Laserfiche WebLink
CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />06/06/1994 Page 1 <br />________________=_______________________________________________________________ <br />Date Range :p5/O1/1992 - 05/31/1994 <br />CM Work Orde: Range ;<glank> - 8405421080229 Pattern :7401196750862 <br />Item Range :<Blan�> - WW22020001 Pattern :* <br />Program ALL Functi�n ALL Activity ALL <br />------_________________°____________________________________________---- <br />CM WORK ORDER ID: 7401196750862 Title: CONVERT 2426 HARRISON <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS219!iN007 -- WATER SERVICE <br />Location ID: __ <br />Program 740 Function 119 Activity 675 <br />Date Completed: 05/16/1994 <br />Overall Craft: <br />Issued: 05/13/1994 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: o hours <br />status: <br />Labor: <br />Craft ID <br />UL NSO <br />UL TDE1 <br />Materials: <br />ID <br />BOX000056247 <br />COUP34135447 <br />METE36089447 <br />SETT34033647 <br />Vehicles: <br />ID <br />V2139 <br />Name <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />--------------------------- <br />NIEISEN, SCOTT 0. <br />THOMPSON, DWAYNE E. <br />Description <br />BOX METER PLA 15�� X 10" W/LID <br />COUPLING 3/4" MIP X 1/2"CTSPJ@ <br />METER 5/8" * NO REMOTE READER <br />SETTER COP 5/8" X 3/4" LGTH15" <br />Description <br />----------------- <br />SVC TRUCK CHEV 86 <br />Work Description: <br />---------------------------- <br />MOVED METER TO BEHIND SIDEFiALK <br />1/2 COPPER. <br />� <br />Planned Hrs <br />0.00 <br />0.00 <br />Actual Hrs <br />4.00 <br />4.00 <br />Total Labor Cost: <br />Date � Used <br />----- -------- <br />05/16/1994 1 <br />05/16/1994 2 <br />05/16/1994 1 <br />05/16/1994 1 <br />Total Material Cost: <br />Date Hours <br />05/16/1994 4.00 <br />Total Vehicle Cost: <br />Cost <br />57.40 <br />54.72 <br />112.12 <br />Cost <br />13.49 <br />9.68 <br />27.21 <br />47.78 <br />98.16 <br />Cost <br />20.40 <br />20.40 <br />--------------------------------------------- <br />CURBSTOP STILL IN PLACE HEHIND CURB. <br />Total cost for work order 7401196750862: y <br />230.66 <br />