My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2521 HARRISON AVE 2016-01-01 MF Import
>
Address Records
>
HARRISON AVE
>
2521
>
2521 HARRISON AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:29:32 AM
Creation date
2/21/2017 1:00:25 AM
Metadata
Fields
Template:
Address Document
Street Name
HARRISON AVE
Street Number
2521
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOBED CM IfORR ORDERS REPORT <br />Total Utility Maintenance Management System paqe 2 <br />09/14/1995 <br />________________________ <br />-------------------- <br />__________________�------ <br />ssecev=cc=e <br />msasazsace=c-c-c_____�-- <br />Date Range :O1/09/1989 - 09/14/1995 <br />CM Work Order Ranqa :1001091070001 - UT2608- ' pattern :*101096750184 <br />Item Ranqe :<Blank> - WW22020001 <br />Proqram ALL Function ALL Activity_ALL____________________=�s=�_=___�______ <br />ss�sss::zss��s�sszsaa�ssavmcc=ceo=e_- <br />CM WORK ORDER ID: 7101096750184 (continued) <br />V2086 91 DODGE PU 1/2 TON <br />V2152 87 DODGE W/HOIST <br />V3603 86 CASE BACKHOE 780 <br />��6807 89 COMPRESSOR IR <br />VJ0002 93 INTERNATIONAL 10 YD <br />4.00 <br />16.00 <br />8.00 <br />8.00 <br />8.00 <br />Total Vehicle Cost: <br />18.80 <br />81.60 <br />339.20 <br />39.20 <br />188.80 <br />734 80 <br />Work Description: <br />------------------- <br />--------------------------- <br />----------------------�----- SS @ CURB 2'D. <br />REPLACED SIDE SEWER FROM MAIN TO CURB. MAIN 12'D, SP 5'D, <br />AHLES <br />Total cost for work order 7101096750184: <br />---2707 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.