Laserfiche WebLink
G <br />C/TY OF EVERETT <br />BU/LDINO AalVIS/ON <br />3Z00 CEDAR Sr" EYEAWrr, WA 00201 (206) ZSN-8010 <br />About this form: This form isn't as involved as it looks, because you only use portions of it for a particular <br />dwelling project. Instead of spending time searching through the WSEC, this form will help org. -ize and <br />condense the requirements that apply to your project. It Is also an excellent tool for learning the residential <br />WSEC requirements. <br />Requirements are grouped by foundation, framing, Insulation, and final Inspection phases. This not only lets <br />you know what you need to do but also when the Inspector will be checking for particular requirements. Use <br />the form to choose compliance options that best suit the economics and design of your project. <br />A designated department energy specialist can help you with your questions. This form will help you comply <br />w1h the WSEC as quickly and painlessly as possible. <br />Responsibility for Information: Although staff members will help you with general questions about <br />2 completing this forth, it is ultimately your responsibility to provide detailed Information about heating systems, <br />glazing, insulation, and other building specifications. Be sure to get prior approval from the Department If you <br />later wish to make changes in your project. For more requirement detail, refer to the Washington State <br />Energy Code, 1991 Edition. <br />3 I�Page 1, Compliance Options: Select one compliance option at the top of the table. <br />Pages 2 through 6, nthhe shaded box areas only: Provide Information and check circles that <br />q apply to your specific project. no not place marks In the two left side columns labeled "COMPLIANCE <br />REQUIRED" and "INSPECTION APPROVED" or In boxes iogated in non -shaded areas (These ar+i.for <br />department use). <br />Since this form will be evaluated for completeness and accuracy, you can avoid unecessary permit delays <br />by carefully providing all required information. You may disregard Items that don't address your particular <br />building or equipment. <br />Compliance responsibility: This form will ultimately be used for all WSEC field Inspections. When it is <br />returned with your permit, relevant boxes under the "COMPLIANCE REQUIRED' column will have been <br />checked by the Building Department. This denotes which WSEC requirements apply to your project. The <br />inspector will Inspect your dwelling against these checked Items and, when deemed acceptable, place a <br />second check In the 'INSPECTION APPROVED" column. <br />All Residential Occupancies <br />Electric Heat source (excluding near pumps) <br />