Laserfiche WebLink
Date��� <br />Application For <br />PUBI_iC WORKS PERMIT <br />Print or Type Only <br />Address <br />Describe Proposed Work <br />Project Address (if known) <br />City <br />� <br />P.ibi�c Warks Permil • <br />Bloy D¢pt � � -�p� <br />n--�y]�a <br />Pub��c WarMs Fae � � <br />Toi Fee s — � <br />Lesa APpI iee PaiE s <br />Baiance oue S Z2O6 � <br />Attach four (4) copies of plans lor proposed work • �raw to scale and note the following as appiicable: <br />• Property Lines • Centerline of streel <br />• Outline and dimensions ol ali existing and • Indicate Norih <br />proposed structures on the Iot • Show any proposed yrading chang�; <br />• Existing end proposed utilities • Show measurements <br />PERMI? CONDIT�ONS <br />1. All calls lor inspection shall be made 24 hrs. in advance • phone 259-881 5. <br />2. All work shail be pertormed in accordance with this permit and wrrent Ciry ot Everett Design and Cons�ruction <br />Standards end Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1•800•424•5555. <br />� P� ��.��� </.�s ��,�� s- /-�b <br />Approved a5 Constructed <br />everett PUBIIC WORKS DEPARTMENT <br />� 3200 Cedar Street <br />Everett, WA 38207 <br />Phone:259•3815 <br />� <br />ACKNOWLEDGEMENT OF CONDITIUNS <br />� <br />0 <br />� <br />N <br />� <br />a <br />1 he undersigned ownerl:.pplicant hereby egrees to hold and save harm� <br />less the City ol Everett Irom any and all claims lor damages, costs, <br />expenses, or causes ol action that may arise because of installation <br />�� c'_� and maintenance ot the improvement or other nght-of-way use hereto <br />applied lor a further agrees to remove same upon notice Lum the <br />Dale City and to r�ce public prop�rfYtle�maged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHlN <br />180 DAYS OF DATE PERMIT IS ISSUE(/ AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PER�11T MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />