Laserfiche WebLink
(� <br />Meg Haley <br />i <br />From: Meg Haley <br />Sent: Monday, December 18, 2006 1:09 PM <br />To: 'impressiondesign@hotmail.com' <br />Subjeet: New Blackbum 4-plex on 816 E. Marine View Driv C0605-041, 2, -043, -044 <br />Attachments: Building Enclosure Checklist.pdf <br />ATTN: Doug Engleson of Impression Design <br />RE: EHB 1848 Submittal Requirements <br />Doug, per our conversation today, the City of Everett will not issue a Certificate of Occupancy for this project until we have <br />received and reviewed the letter stating that the building enclosures were inspected periodically during construction, and <br />that the buildings were constructed or reconstructed in substantial compliance with the building enclosure design <br />documents. Each Certificate of Occupancy will be issued separately for each unit, so a letter will be required for each of <br />the four units. <br />This is a cuRent copy of our EHB 1848 checklist for your reference: <br />� <br />Building Enclasure <br />Chetklist.p... <br />Please feel free to contact me if you have any questions or would like to discuss these requirements. <br />Meg�}ialey <br />Ciry of Everett <br />3200 Cedar Street <br />Everett. W� 98201 <br />Ph: 425-257-BA13 <br />Fax: 425-257-A856 <br />m haley(dci.everett.wa. us <br />www everettwa orpldefault.aspx7�U=776 <br />