|
CITY OF EVERETT 2003 TO 2008 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> PROJECT PRIO- PE 1 R/W CONST. Est.2003-08 LEAD MAP
<br /> TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> Local Access 1 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Langus Riv.Park Nov.01 Jun.05 6,000,000 *'EVERETT 33
<br /> Local Access 2 BNSF RR track relocation Pacific Avenue to Lowell Junction 'Apr.01 Apr.01 Aug.02 ' 3,700,000 EVERETT 34
<br /> Local Access 3 Interurban Trail,Northern extension Madison Street to 41st Street Mar.98 i Sep.99 Jun.00 925,000 EVERETT 35
<br /> Local Access 4 Hoyt-Wetmore two-way Str.Conversion 19th-32nd St.(Hoyt)-19th to 37th St(Wetmore) Jan. 01 Jul.02 283,000 EVERETT 36
<br /> Local Access 5 Annual Street Overlay Program Various streets within city limits Sep.02 Sep.03 10,770,000 EVERETT 1 N/A
<br /> Local Access 6 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue Jan.99 Jun.01 55,000 EVERETT 37
<br /> Local Access 7 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jan.99 Jun.01 500,000 EVERETT 18
<br /> Local Access 8 East Everett Pedestrian Walkway Pacific Avenue to E.Marine View Dr. Sep.01 May.02 890,000 EVERETT 38
<br /> Local Access 9 41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway Jan.02 Jun.02 r 1,700,000 * EVERETT 39
<br /> Local Access 10 13th Street Bike-Ped Improvements W.Marine View Drive to Waterfront Apr.00 Apr.04 700,000 EVERETT 40
<br /> Local Access 11 10th Street Pedestrian Improvements Pine Street to East Marine View Drive .Mar.02 Apr.03 102,000. EVERETT 41
<br /> Local Access 12 106th Place SE Improvements .16th Avenue SE to 19th Avenue SE Sep.00 Jan.03 Jun.04 350,000 `EVERETT 42
<br /> Local Access 13 BNSF RR safety improvements Various railroad crossings in Everett Jan.02 Jun.03 550,000, EVERETT N/A
<br /> V Local Access 14 Terminal Ave.Ped.Improvements California Street to Bond Street Jun.02 Aug.03 ' 200,000 '.EVERETT 43
<br /> Local Access 15 Pavement Marking Project Various locations within city limits Jan.03 May.03 200,000 'EVERETT N/A
<br /> Local Access 16 Neighborhood Block Grants Various locations within city limits Jan.03 May.03 360,000 ' EVERETT N/A
<br /> Local Access 17 Neighb.Traffic Mitig.Studies&Projects Various locations within city limits 'Jan.03 May.03 2,400,000 * EVERETT N/A
<br /> Local Access 18 Roadway Hazard Elimination Projects Various locations within city limits Mar.03 Sep.03 120,000 ' EVERETT N/A
<br /> Local Access 19 Port of Everett Public Access Wlkwy. Bond Street to Pigeon Creek No. 1 Jan.03 Jun.04 i 200,0001 * EVERETT ' 44
<br /> Local Access 20 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE IJan.04Apr.05 600,000', *EVERETT 45
<br /> Local Access 21 California Street Improvements Virginia Avenue to Maple Street Jul.04 May.05 580,000' ' EVERETT 46
<br /> Local Access 22 Upper&Lower Ridge Rd.str.improv. 74th Street to 78th Street iAug.04 Jun.05 300,000 " EVERETT 47
<br /> Local Access , 23 Interurban Trail Completion 44th Street to 41st StreetMar.02 Mar.03 Jun.04 200,000, "EVERETT 48
<br /> Local Access 24 Traffic Signal Interconnect Various locations within city limits May.03 240,0001 EVERETT N/A
<br /> Local Access 25 Traffic Signal Improvements Various locations within city limits Jan.03 Jun.03 900,000 EVERETT N/A
<br /> Local Access 26 Developer Traffic Signals Various locations within city limits Mar.03 Sep.03 600,000 EVERETT ! N/A
<br /> Local Access 27 ITMS Upgrades Various signals in Everett Jan.05 Apr.06 1,600,000'* EVERETT N/A
<br /> Local Access 28 Sidewalk repair and replacement Various locations within city limits Apr.03 360,000, 'EVERETT N/A
<br /> Local Access 29 City Entryway Landscaping and Signs Various entry corridors into the City Mar.03 Jul.03 150,000 EVERETT ' N/A
<br /> Local Access 30 Everett Non-Motorized Projects"' Various locations within city limits May.03 'Oct.03 Jun.04 600,000 * EVERETT N/A
<br /> Candidate non-motorized improvements include Noton Avenue,Olympic Drive, Smith Avenue,Wall Street,
<br /> Bond Street,Lowell River Road,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW,
<br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,
<br /> Cady Road,Fleming Street,75th Street and various shoreline public access projects
<br /> A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2002-2007 Six-Year TIP. 36,135,000
<br />
|