Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Call for Bids for the X Consent COUNCIL BILL# <br /> Construction of the Lift Station Action Originating Department PW/Utilities <br /> 36 Modifications Project. First Reading Contact Person Jenifer Galatas' <br /> Second Reading Phone Number 425-257-7215 <br /> Third Reading FOR AGENDA OF 12/28/05 <br /> Public Hearing <br /> Initialed by: <br /> epartment Head <br /> 0CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Attached Project Authorization of Project Location Map <br /> Location Map Professional Services <br /> Agreement for Design, <br /> November 2003 <br /> Amount Budgeted $ 650,000 <br /> Expenditure Required $ 2,000 Account Number(s): UP 3086 <br /> Budget Remaining $ 648,000 <br /> Additional Required $ 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Lift Station 36 Modifications project will redirect sewer flows from Lift Station 36 to the South End <br /> Interceptor to eliminate multiple pumping and free up capacity at other lift stations. This project includes <br /> installation of several manholes along an existing sewer main; construction of a new forcemain between Lift <br /> Station 36 and SR 527; and minor modifications at Lift Station 36. The new forcemain will connect to a <br /> forcemain installed with the SR 527 Roadway Improvement Project. <br /> The Professional Services Agreement for the design of this project was approved in November 2003. The <br /> design is now complete and the project is ready to bid for construction. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a Call for Bids for the construction of the Lift Station 36 Modifications Project. <br /> 4 <br />