Laserfiche WebLink
2 <br /> problems when asked by the construction contractor, but shall explicitly tell the construction <br /> contractor that such solution is a suggestion only and that the construction contractor remains <br /> responsible for the means,methods,techniques and sequence_ <br /> 26. City-Furnished Data. To the extent CH2M Hill asks the City to furnish existing data or <br /> other information in the possession of the City, the City will provide such data as it can <br /> reasonably retrieve from the City's files. The parties acknowledge CH2M Hill may reasonably <br /> rely upon the accuracy of such data or information, unless (a) the City informs CH2M Hill that <br /> the data or information may be unreliable or (b) a reasonable professional engineer would have <br /> reason to question to the accuracy of the information or data due to such things as a conflict <br /> within the data or information so provided or a conflict between the provided data or information <br /> and other data or information in CH2M Hill's possession in performance of the Work. <br /> 27.Access to Facilities and Property. City will make its facilities accessible to CH2M Hill as <br /> required for CH2M Hill's performance of its services. If, and to the extent, unusual or <br /> extraordinary safety precautions are required, the parties will discuss such precautions prior to <br /> CH2M Hill visiting such facility. If CH2M Hill staff realize during a visit to a facility that such <br /> unusual or extraordinary safety precautions are required,but have not been implemented, CH2M <br /> Hill staff shall immediately terminate their visit and discuss needed precautions with the City_ <br /> 28. Opinions of Cost. This section shall apply if the Scope of Work requires CH2M Hill to <br /> provide opinions of cost, financial analyses, economic feasibility projections, and schedules for <br /> the Project. CH2M Hill has no control over: (a) cost or price of labor and materials; (b) <br /> unknown or latent conditions of existing equipment or structures that may affect operation or <br /> maintenance costs; (c) competitive bidding procedures and market conditions; (d) time or quality <br /> of performance by City personnel or third parties; and (e) other economic and operational factors <br /> that may materially affect the ultimate Project cost or schedule. Therefore, CH2M Hill makes no <br /> warranty that the City's actual Project costs, financial aspects, economic feasibility, or schedules <br /> will not vary from CH2M Hill's opinions, analyses, projections, or estimates. CH2M Hill will, <br /> however, make such opinions, analyses, projections or estimates in accordance with standard <br /> practices of reasonable professional engineers performing such work. <br /> 29. Record Drawings. Record drawings, if required, will be prepared, in part, on the basis of <br /> information compiled and furnished by others, and may not always represent the exact location, <br /> type of various components,or exact manner in which the Project was finally constructed. CH2M <br /> Hill is not responsible for any errors or omissions in the information from others incorporated <br /> into the record drawings, unless a reasonable professional engineer would have reason to <br /> question to the accuracy of the information provided by others. <br /> 9 <br /> 1 2 • <br />