My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/01/11 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/01/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 10:21:01 AM
Creation date
2/22/2017 10:20:43 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC-20-2005 TUE 03:27 PM HWA GEOSCIENCES FAX NO. 4257742714 P. 05 <br /> December 20,2005 5 <br /> HWA Proposal No.P 5525 <br /> d) Evaluation of the suitability of pipe bursting methods. <br /> e) Pavement design and restoration recommendations. <br /> Task 7. Project Meetings: We will participate in up to two project meetings with the design <br /> team,to discuss our findings and recommendations. <br /> Task & Project Management: We will provide project management of the geotechnical <br /> engineering study. Wc will correspond with CHS and the City as required in the form of ernails, <br /> telephone calls,and facsimile. Wc will prepare progress reports with our monthly invoices if <br /> required. <br /> COST ESTIMATE <br /> We estimate the cost of the scope of work proposed herein, including the contingency for <br /> additional drilling,to be approximately$21,000. A breakdown of these costs is provided on the <br /> attached worksheets. We apply a 15%markup on subcontractor expenses,to cover state- <br /> mandated B&O taxes. Our current WSDOT-approved overhead rate is 185.49%. <br /> The field investigation task proposed represents the minimum level of effort that is consistent <br /> with the standard of care in geotechnical engineering in this geographic arca. If unexpected <br /> conditions are revealed during the evaluation,or if analyses and evaluations requiring an <br /> expanded level of effort become necessary, we will contact you immediately to discuss any <br /> necessary modifications to our scope of services and/or budget estimate. <br /> Our scope of services does not include the evaluation of the potential presence and/or <br /> concentrations of contaminated and/or hazardous materials on site, nor the identification or <br /> delineation of wetlands and the project's potential impact on them. <br /> SCI IEDULE <br /> We will work with you to ensure that your schedule requirements are met. We arc prepared to <br /> begin work immediately upon your authorization to proceed. Based on current driller <br /> availability,we will need at least two weeks to schedule a drilling subcontractor. Our draft <br /> report can be prepared within one month of completion of the field work. <br /> 0.0 <br /> P5525 v3 floc 4 IIWA GEOSCIL-NCES INC. <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.