Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> A Professional Services Consent COUNCIL BILL# <br /> Agreement with Perteet X Action Originating Department Utilities <br /> Engineering,Inc. First Reading Contact Person John McClellan <br /> Preconstruction Support for Second Reading Phone Number 257-8201 <br /> Water Filtration Plant Projects Third Reading FOR AGENDA OF Jan. 18, 2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA all <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant None Professional Services Public Works-Utilities <br /> Agreement <br /> Amount Budgeted $14,500,000. <br /> Expenditure Required $32,200. Account Number(s): UP-3193 &3198 <br /> Budget Remaining $13,980,000. <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> Two construction projects, currently in design, are scheduled to begin in 2006 at the Water Filtration Plant: <br /> the new primary disinfection facility and the new Clearwell No. 2. The Water Filtration Plant requires pre- <br /> construction period support for design and constructability review for the Disinfection Facility and Clearwell <br /> projects through design and bidding phases. These services will be provided by JacKaren Consulting LLC as <br /> a subcontractor to Perteet Engineering, Inc. The Utilities Division anticipates a follow up contract to provide <br /> support services during the construction period for these projects. $450,000. in design costs have been <br /> expended to date. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with Perteet Engineering, Inc. to provide <br /> preconstruction support services for the contract amount of$32,200.00. <br />