My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/01/18 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/01/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 10:27:37 AM
Creation date
2/22/2017 10:27:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> A Professional Services Consent COUNCIL BILL# <br /> Agreement with Perteet X Action Originating Department Utilities <br /> Engineering,Inc. First Reading Contact Person John McClellan <br /> Preconstruction Support for Second Reading Phone Number 257-8201 <br /> Water Filtration Plant Projects Third Reading FOR AGENDA OF Jan. 18, 2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA all <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant None Professional Services Public Works-Utilities <br /> Agreement <br /> Amount Budgeted $14,500,000. <br /> Expenditure Required $32,200. Account Number(s): UP-3193 &3198 <br /> Budget Remaining $13,980,000. <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> Two construction projects, currently in design, are scheduled to begin in 2006 at the Water Filtration Plant: <br /> the new primary disinfection facility and the new Clearwell No. 2. The Water Filtration Plant requires pre- <br /> construction period support for design and constructability review for the Disinfection Facility and Clearwell <br /> projects through design and bidding phases. These services will be provided by JacKaren Consulting LLC as <br /> a subcontractor to Perteet Engineering, Inc. The Utilities Division anticipates a follow up contract to provide <br /> support services during the construction period for these projects. $450,000. in design costs have been <br /> expended to date. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with Perteet Engineering, Inc. to provide <br /> preconstruction support services for the contract amount of$32,200.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.