Laserfiche WebLink
EXH1 ) A _ z <br /> SCOPE OF WORK, FEE ESTIMATE,AND SCHEDULE <br /> SCREEN HOUSE IMPROVEMENTS <br /> CITY OF EVERETT <br /> TASKS TO COMPLETE <br /> Currently, the Panther Creek Screen House project is at the 90% design level. <br /> Comments on the 90% submittal have caused several changes to the current design <br /> and the City has requested that the project team prepare a scope of work, fee <br /> estimate, and schedule for completing the project. This Scope of Work,Fee <br /> Estimate, and Schedule is in response to that request. <br /> A. Scope of Work <br /> Task I Incorporate Changes and Complete Drawings <br /> Incorporate industrial water channel revisions, incorporate comments, <br /> and complete all drawings to final design level. <br /> Task H Specifications <br /> Add specifications as required for industrial water channel revisions, <br /> incorporate comments, and complete all specifications to final design <br /> level. <br /> Task III Alternative Design Memorandum&Additional Hydraulic <br /> Calculations <br /> Prepare Design Memorandum summarizing the requested design <br /> modifications, including additional calculations, preliminary drawings, <br /> and operating strategies for City approval. <br /> Task IV Cost Estimate <br /> Prepare final construction cost estimate incorporating all project <br /> elements. <br /> Task V Respond to Comments <br /> Prepare responses to comments on 90% Submittal. <br /> Task VI Quality Assurance/Quality Control <br /> Perform final quality review and checking of project documents. <br /> 1 2 Page 1 <br /> 10 January 2006 <br />