Laserfiche WebLink
December 1,2005 <br /> - as s o a tt-1 <br /> Bob Richardson Landscape Architects&Planners <br /> 100 S.King Street,Srtii-e 200,Seattle,WA 98104 <br /> BERGER/ABAM Engineers Inc. t 206.583-0620 £206.583.0623 <br /> 33301 9th Ave South www.jabrennan coni <br /> Federal Way,WA 98003-6395 <br /> Re: Panther Creek Screen House <br /> City of Everett Public Works <br /> Thank you for the opportunity to provide Landscape Architectural services for the Panther Creek Screen <br /> House pioject. The following is our scope and fee for the project. • <br /> 1. This letter will confirm previous discussion and serve as the contract between BERGER/ABAM Inc. <br /> and J.A.Brennan Associates,PLLC for preparation of the Panther Creek Screen House planting pla-n <br /> 2. Our compensation for the Scope of Work shall be as defined below: <br /> 3. All services shall be completed by January 31,2005. <br /> Services to be pi ovided include: <br /> 1. Site Visit 6 hours <br /> 2_ Concept Plan 10 hours <br /> 3: PlantingPlan 17 hours <br /> 4. General Notes 9 hours <br /> 5. Cost Estimating 6 hours <br /> 6. Meeting 6 hours <br /> Total hours 54 hours <br /> Landscape Architect 24 hours x$115.00 $2,760.00 <br /> Landscape Designer 30 hours x$65.00 $1,950.00 <br /> Total labor $4,710.00 <br /> Reimbursable $290.00 <br /> Total Fee $5,000.00 <br /> Assumptions: <br /> 1. BERGER/ABAM Engineers Inc.will provide base plan showing proposed landscape areas and <br /> existing building locations,and entry to site. <br /> 2. No irrigation provided. <br /> 3. Irrigation design Will be additional services. <br /> 4. Up to one revision provided. <br /> 5. All work to be completed by January 30,2005 <br /> 6. No public meetings are anticipated <br /> Sincerely, <br /> BERGER/ABAM Engineers Inc. Accepted By. <br /> James A Brennan <br /> Principal <br /> Date: Date: 19 <br /> 4-i-rMAIMEICr S <br />