My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2001 TO 2006 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Interstate Local Access <br /> 1. I-5 Corridor Improvement Study 1. Interurban Trail, northern extension <br /> 2. I-5 Median HOV Lanes &Auxiliary Lanes 2. Annual Street Overlays(city-wide) <br /> 3. I-5 /41st Street Interchange 3. Neighborhood Traffic Mitigation Projects <br /> 4. I-5/ 100th Street SE HOV access/undercrossing 4. Pedestrian Improvements(city-wide) <br /> 5. I-5 / 112th Street SE Direct Access HOV Ramps 5. Neighborhood Block Grants <br /> 6. I-5 / 112th Street SE Park&Ride Flyer Stop 6. Traffic Signal Interconnect <br /> 7. I-5 /US 2 Interchange 7. Pavement Marking Project <br /> 8. Traffic Signal Improvements <br /> Freeways 9. Developer Traffic Signals <br /> 1. SR 526/Hardeson Road Interchange 10. Hazard Elimination& Safety Projects <br /> 11. Roadway Hazard Elimination Projects <br /> Principal Arterials 12.Neighborhood Traffic Studies <br /> 1. 19' Avenue SE(SR 527)Improvements 13. Riverfront Walkway Phase 1 <br /> 2. East Marine View Drive Improvements 14. Riverfront Walkway Overcrossing <br /> 3. Pacific Avenue Overcrossing 15. Riverfront Walkway Phase 2 <br /> 4. Evergreen Way Widening, 112th St. SW to Airport 16. 13th Street Bicycle-Pedestrian Improvements <br /> 5. Evergreen Way Widening, 41st Street to 47th Street 17. 10th Street Pedestrian Improvements <br /> 6. Broadway/Beverly Blvd. Intersection Improvements 18. 106th Place SE Improvements <br /> 7. Broadway Corridor Study 19. Terminal Avenue Pedestrian Improvements <br /> 8. Arterial Needs Study 20. Norton Avenue Pedestrian Improvements <br /> 9. SR 525 Corridor Projects 21. Olympic Drive Pedestrian Improvements <br /> 10. Evergreen Way HOV Emphasis Improvements 22. I-5/Snohomish River Bike-Pedestrian Bridge <br /> 11. 19th Avenue SE HOV Treatments 23. Port of Everett Public Access Walkway <br /> 24. 41st Street Bike-Ped Connector Trail <br /> Minor Arterials 25. City Entryway landscaping and signs <br /> 1. 41St Street Overcrossing 26. Neighborhood Street Improvements <br /> 2. Riverfront Parkway 27. 3`d Avenue SE Street Improvements <br /> 3. 112th Street SW Street Improvements 28. California Street Improvements <br /> 4. 112th Street SW-SE Street Improvements 29. Upper& Lower Ridge Road Street Improv. <br /> 5. 112th Street SE Street Improvements 30. Everett Non-Motorized Transp. Projects <br /> 6. 100th Street SW Street Improvements <br /> Transit <br /> Collector Arterials 1. Bus Replacements-2001 to 2006 <br /> 1. 36th Street Park and Ride Improvements 2. Vehicle Maintenance Capitalization <br /> 2. California Street Overcrossing 3. Regional Fare Coordination Project <br /> 3. 52nd Street Improvements 4. Transit Operations $Maint. Facil. Siting Study <br /> 4. Everett Avenue BNSF Overcrossing 5. Boeing Mitigation Park&Ride Lots, 2002 <br /> 5. 16th Street Improvements 6. Operations Support Vehicle Replacement <br /> 6. 37th Street Improvements <br /> 7. Holly Drive Pedestrian Improvements HOV Projects <br /> 8. Smith Island Roadway Improvements 1. Everett Station Construction <br /> 2. Everett Station Commuter Rail Improvements <br /> 3. South Everett Transit Center <br /> 4. North Everett Transit Center <br /> 5. Implementation of State CTR Law <br /> Projects shown in bold type were not included in <br /> The City's 2000-2005 Six Year TIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.