My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT 2001 TO 2006 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN I <br /> PROJECT PRIO- PE RAN CONST. Est.2001-06 ' LEAD MAP <br /> TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> , <br /> Local Access 1 Interurban Trail, Northern extension Madison Street to 41st Street Mar.98 Sep.99Jun.00 925,000 EVERETT 31 <br /> Local Access 2 Annual Street Overlay Program Various streets within city limits Jan.00 Jul.00 10,770,000 EVERETT N/A <br /> Local Access 3 Neighborhood Traffic Mitig.Projects Various locations within city limits Jan.00 May.00 2,400,000 * EVERETT N/A <br /> Local Access 4 Pedestrian Improvements(City-wide) Various locations within city limits Jan.01 May.01 360,000 EVERETT N/A <br /> Local Access 5 Neighborhood Block Grants Various locations within city limits Jan.01 May.01 360,000 * EVERETT N/A <br /> Local Access 6 Traffic Signal Interconnect Various locations within city limits May.01 240,000 EVERETT N/A <br /> Local Access 7 Pavement Marking Project •Various locations within city limits Jan.01 May.01 200,000 EVERETT N/A <br /> Local Access 8 Traffic Signal Improvements Various locations within city limits Jan.01 Jun.01 900,000 EVERETT N/A <br /> Local Access 9 Developer Traffic Signals Various locations within city limits Mar.01 Sep.01 600,000 EVERETT N/A <br /> Local Access 10 Hazard Elimination and Safety Projects _Ev.MaIIWy.,Broadway,Colby Ave. Jul.00 Mar.01 290,000 * EVERETT N/A <br /> Local Access 11 Roadway Hazard Elimination Projects Various locations within city limits Mar.01 Sep.01 120,000 * EVERETT N/A <br /> Local Access 12 Neighborhood Traffic Studies Various neighborhoods Jun.01 70,000 * EVERETT N/A <br /> Local Access 13 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue Jan.01 May.01 _ 55,000 EVERETT 32 <br /> Local Access 14 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Sep.00 Sep.01 500,000 EVERETT 32 <br /> Local Access 15 Riverfront Walkway Phase 2 Pacific Avenue to East Marine View Dr. Sep.00 Sep.01 890,000 EVERETT 32 <br /> Local Access 16 13th Street Bike-Ped Improvements W.Marine View Drive to Waterfront Apr.00 _Apr.01 700,000 EVERETT 33 <br /> Local Access 17 10th Street Pedestrian Improvements Pine Street to East Marine View Drive Sep.00 Jun.01 102,000 EVERETT 34 <br /> Local Access 18 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Sep.00 _Jan.01 Jun.01 350,000 * EVERETT 35 <br /> Local Access 19 Terminal Avenue Ped.Improvements California Street to Bond Street Apr.01 Aug.01 200,000 * EVERETT 36 <br /> Local Access 20 Norton Avenue Ped.Improvements Clinton Place to 41st Street Sep.01 Jun.02 270,000 ' EVERETT 37 <br /> Local Access 21 Olympic Drive Ped.Improvements Mukilteo Boulevard to Park Place Jun.01 Jun.02 125,000 * EVERETT 38 <br /> Local Access 22 1-5/Snohomish River Ped.Bridge E.Marine View Drive to Langus Riv.Park Apr.01 Jun.02 2,700,000 * EVERETT 39 <br /> Local Access 23 Port of Everett Public Access Wlkwy. _Bond Street to Pigeon Creek No.1 Jan.03 Jun.04 200,000 * EVERETT 40 <br /> Local Access 24 41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway _Jan.02 Jun.02 1,700,000 ' EVERETT 41 <br /> Local Access 25 City Entryway Landscaping and Signs Various entry corridors into the City Mar.01 Jul.01 150,000 * EVERETT N/A <br /> Local Access 26 Neighborhood Street Improvements Various City neighborhood locations Jan.01 Mar.02 250,000 * EVERETT N/A <br /> Local Access 27 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.02 Apr.03 600,000 * EVERETT 42 <br /> Local Access 28 California Street Improvements Virginia Avenue to Maple Street Jul.02 May.03 580,000 * EVERETT 43 <br /> Local Access 29 Upper&Lower Ridge Rd.str.improv. 74th Street to 78th Street Aug.02 Jun.03 300,000 ' EVERETT 44 <br /> Local Access 30 Everett Non-Motorized Projects Various locations within city limits May.01 Oct.01 Sep.02 600,000 * EVERETT 45 <br /> * A portion or all of the funding for this project has not yet been committed. 27,507,000 <br /> NOTE: Projects shown in bold type were not included in the 2000-2005 Six-Year TIP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.