Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Authorize the Mayor to execute Consent COUNCIL BILL # <br /> WSDOT Utility Construction X Action Originating Department Public Works <br /> Agreement for 24"water main First Reading Contact Person Heather Griff <br /> crossing at 112`h Street SW and Second Reading Phone Number 257-7206 <br /> 1-5 Third Reading FOR AGENDA OF March 15,2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> /CounCAA 5/6— <br /> Council <br /> cil President <br /> Location Preceding Action Attachments Department(s)Approval <br /> 112 Street SW & 1-5 WSDOT Permit Utility Construction Legal <br /> Application Agreement <br /> Amount Budgeted $810,000.00 <br /> Expenditure Required $594,892.36 <br /> Account Number(s): UP #3228 <br /> Budget Remaining $214,607.64 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett has requested Sound Transit to include the design and construction of a new 24-inch <br /> water main crossing to be installed with the new 112`h Street bridge at I-5. This new water main replaces an <br /> existing 12" water main crossing. The 112`h Street bridge falls within the Washington State Department of <br /> Transportation(WSDOT) I-5 right-of-way. The design and construction of the new 112th Street bridge at I-5 <br /> is being managed by WSDOT. WSDOT requires a Utility Construction Agreement to cover the construction <br /> costs associated with the new water main. The water main portion of the construction cost estimate as <br /> prepared by WSDOT is $594,892.36. The scope of work and construction cost estimate for this project are <br /> attached. <br /> RECOMMENDATION: <br /> Authorize the Mayor or his designee to execute Utility Construction Agreement#01100 with WSDOT for <br /> the construction of a new 24-inch water line on 112th Street crossing Interstate 5 for$594,892.36. <br /> 11 <br />