My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/03/15 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/03/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:07:43 AM
Creation date
2/24/2017 9:06:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Authorize Mayor to sign the Consent COUNCIL BILL# <br /> Interlocal Agreement establishing a x Action Originating Department Legal <br /> Joint Board between the City and First Reading Contact Person Ned Johnston <br /> the Tulalip Tribes to implement § Second Reading Phone Number 257-8727 <br /> C. 1. of the September 16,2005 Third Reading FOR AGENDA OF March 15, 2006 <br /> Agreement for Settlement, Water Public Hearing <br /> Supply, and Water Delivery System Initialed by: <br /> with the Tulalip Tribes to develop a Department Head <br /> comprehensive mechanism to CAA t• <br /> provide financial,project budget, Council President <br /> construction management, etc. for <br /> the proposed water delivery system. <br /> Location Preceding Action Attachments Department(s) Approval <br /> Amount Budgeted <br /> Expenditure Required Account Number(s): <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The Agreement for Settlement, Water Supply, and Water Delivery System with the Tulalip Tribes, executed <br /> on September 16, 2006 provides: "The Tribe and the City will manage the construction through a Joint <br /> Board, see RCW 39.34.030 (4)(a),that will develop a comprehensive mechanism mutually agreed upon by <br /> the Parties which will address, among other things,financial management, project budgeting, construction <br /> management,bidding, insurance issues, liability issues, payment schedules, and claims issues." The law <br /> referred above, allows an Interlocal Agreement creating a"Joint Board"composed of representatives from <br /> the City and the Tribes. This Interlocal Agreement creates a Joint Board entitled: "Tulalip and City Joint <br /> Board for Managing the Construction of the Everett to Tulalip Waterline". It consists of two representatives <br /> from each of the two entities. This Interlocal Agreement is the first step in a proposed series of steps towards <br /> the goal of constructing the water supply pipeline contemplated in the Agreement. Its first task is to develop <br /> and recommend a comprehensive mechanism to deal with the financing,planning and construction issues <br /> inherent in such a project. <br /> RECOMMENDATION (Exact action requested of Council): Authorize Mayor to sign the Interlocal <br /> Agreement establishing a Joint Board between the City and the Tulalip Tribes to implement § C. 1. of the <br /> September 16, 2005 Agreement for Settlement, Water Supply, and Water Delivery System with the Tulalip <br /> Tribes to develop a comprehensive mechanism to provide financial,project budget,construction <br /> management,etc. for the proposed water delivery system. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.