Laserfiche WebLink
P <br />CLOSED CM WORK ORDERS REPORT 6 ��� �O b <br />Total Utility Maintenance Management System <br />04/30/1998 Page 1 <br />Date Range :01/09/1989 - 04/14/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196730237 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />====c=xx===x=====c=cc==cv==xx==x=ox=xsxv=sxxxxx=c=xx=xv=x===xxxxxxxxxxvxxxx===x= <br />CM WORK ORDER ID: 7101196730237 Title: REPAIR 1030 NORTH PARK <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 673 <br />Date Completed: 04/14/1998 <br />Overall Craft: <br />Issued: 04/14/1998 Issued by: JSM Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />ID <br />Name <br />Planned Hrs <br />Actual Hrs <br />Cost <br />----- <br />UI, <br />------ <br />CSG <br />------------------------------ <br />CAVANAH, <br />SHANE G. <br />----------- <br />0.00 <br />---------- <br />2.00 <br />---------- <br />29.02 <br />WST <br />JSM <br />JEX, STERLING M. JR. <br />0.00 <br />0.50 <br />11.11 <br />WST <br />LDS <br />LOFLING, <br />DELMAR S. <br />0.00 <br />2.00 <br />44.74 <br />WST <br />TDE1 <br />THOMPSON, <br />DWAYNE E. <br />0.00 <br />2.00 <br />41.24 <br />UL <br />WTE <br />WESTVANG, <br />TERRY E. <br />0.00 <br />2.00 <br />32.40 <br />Materials: <br />ID Description <br />------------ ------------------------------ <br />COUP44027347 COUPLING 611DICI&AC X 6"DICI&AC <br />PIPE44055147 PIPE 6" TYTON JOINT DI <br />Vehicles: <br />ID Description <br />V0042 <br />'96 <br />CHEV <br />ASTRO VAN <br />V2117 <br />91 <br />CHEV <br />1-TON HYD UNIT <br />V2119 <br />91 <br />CHEV <br />5 YD <br />VJ0026 <br />'97 <br />FORD <br />1 TON SVC TRUCK <br />VT0007 <br />94 <br />ATLAS <br />COMPCO COMP. <br />Total Labor Cost: <br />Date # Used <br />---------------- <br />04/14/1998 2 <br />04/14/1998 4 <br />Total Material Cost: <br />Hours Cost <br />0.50 <br />2.40 <br />2.00 <br />10.40 <br />2.00 <br />21.20 <br />2.00 <br />11.80 <br />2.00 <br />9.80 <br />Total Vehicle Cost: 55.60 <br />-------yl <br />158.51 <br />Cost <br />95.52 <br />28.12 <br />123.64 <br />Work Description: <br />--------------------------------------------------------------------------------- <br />CONTRACTGR HIT MAIN. LOCATE WITHIN LIMITS. <br />