My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10932 PAINE FIELD WAY 2016-01-01 MF Import
>
Address Records
>
PAINE FIELD WAY
>
10932
>
10932 PAINE FIELD WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:21:18 AM
Creation date
2/24/2017 9:21:12 AM
Metadata
Fields
Template:
Address Document
Street Name
PAINE FIELD WAY
Street Number
10932
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PUBLIC �ORKS PERMIT • Date: 5/11/2012 <br /> " ''%, �-� Public Works Permit#: PW1205-Ot 5 <br /> City of Everetl Public Works Department <br /> 3200 Cedar Street Buildinq Permit#; C1204-007 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8870 <br /> Public Works Fee S: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ADAIR ENTERPRISES <br /> 17032 35TH AVE SE <br /> BOTHELL WA 98012 <br /> PMONE: 4257431716 PHONE: <br /> TAX PARCEL IDM 005379000U1504 SITE ADDRESS: 10932 PAINE FIELD WAY <br /> DESCRIPTION UF PROPOSED WORK: <br /> NEW HOUSE <br /> LOT 2-SHORT PLAT 7202-3Q-o"F <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current Ciry of Everett Design and Construction Standards <br /> - - and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect side sewer per City Standard�'s 601, 602, 604. <br /> 5. Connect rooftop downspouts to the drainage system provided for this lot. ,; �:?5;W <br /> 6. Install erosion control measures per Ciry of Everett Standards for small parcels. �� �•r•�-- �--�— � =� �"' <br /> 7. Remove erosion control measures upon completion of the project prior to finalapproval o�.the:permit<x�w ; ' � <br /> B. No dirt, mud, rocks or debris to be tracked onto roadway. � ��c;�;: �F`n c :' � <br /> 9. No building materials to be stacked on sidewalk/roadway and sidewalklroadway to be kePt clean aid oa'e'n f�r.� � <br /> pedesirian travel. F <br /> 10. Construct per approved shoR plat. � � ��0` <br /> ^ H.�.' + <br /> � <br /> ��� �z <br /> �.�r ^ <br /> n �, �. .,. _,o <br /> i�•.� va !, r-%.�%�r �� <br /> �n, �--.�•.�--r.n�.i m r.�:: <br /> tn .n�.�..5.�..-�ro r.�o r.i <br /> fJ n�-i..G C�Dq 1.�_1 L�l�V 1 _ I/� <br /> trR��qOC�v�V.jG;I-•C� VJ <br /> 4�1 M 1 O V<'.J�Sl�.]C.._ �T Ce �j '. <br /> C7ld <br /> ��.� �a <br /> ��:, <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> Th2 undersigned ownerlappiicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims(or <br /> damages,costs,expenses,or causes of action that may arise <br /> because ot instalialion and maintenance of the improvemenl <br /> p � or other right-of-way use hereto applied tor and fuhher agrees <br /> A 2d for Cons u n ate to remove same upon nolice irom the City and to replace <br /> public property damaged thereby. <br /> FINAL INSPECTION Date �--�� S�aq1 I "� <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMiT MUST 8E STARTED WITHIN 180 DAYS OF DATE PERMR IS ISSUED AND THEREAFTER IS TO BE DILIGENILY <br /> PURSUED TO COMPLETiON. THIS PERMR MAY BE CANCELLED BY THE CCfY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.