My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10934 PAINE FIELD WAY 2016-01-01 MF Import
>
Address Records
>
PAINE FIELD WAY
>
10934
>
10934 PAINE FIELD WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:22:02 AM
Creation date
2/24/2017 9:21:54 AM
Metadata
Fields
Template:
Address Document
Street Name
PAINE FIELD WAY
Street Number
10934
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C � <br /> Mea Haley <br /> From: Meg Haley <br /> Sent: Monday, December 13, 2010 2:16 PM <br /> To: 'kelly@pacwestsalesinc.com' <br /> Cc: 'sales@a-pexdesignservices.com'; 'nwpc@msn.com'; Jim Venturo; Kirk Brooks; Tony Lee; Bill <br /> Bruce <br /> Subject: Second corrections e-mail for permit K1011-001, 10934 Paine Field Way <br /> Project: Multi-purpose sprinkler system for single family (basic) <br /> Job Address: 10934 Paine Field Way <br /> Plan Review No: K1011-001 <br /> �ear Kelly, <br /> There are two things missing from the resubmittai, the riser diagram and the plumbing contractors certificate <br /> of competency stamp: <br /> 1. Attached is an example of a riser diagram, which is a schematic layout of the specific design proposed. <br /> This riser design should reflect all the notes on the policy diagram that was sent with the previous <br /> corrections letter, as well as all the fixtures and floors service by the fire service. <br /> �� <br /> 0945_OOl.pdf <br /> 2. The State Fire Marshal's office requires that in addition to the "for design only" certificate of <br /> competency stamp, that the plumbing contractor submitting the drawings also have their certificate of <br /> competency stamp on the drawings, since the plumbing contractor will have oversight responsibilities <br /> for the installation. This was done correctly on the first submittal. <br /> To expedite the processing of this submittal, this e-mail will serve as the second corrections letter, and a copy <br /> of this e-mail plus ali the information you delivered to me today will be up at our front counter for you in will- <br /> call, under your name. <br /> �Meg <br /> �a�r,Manei,��o��,�.r,.. . . � . ,,, • ,...,;�, � �, ;��,; � _��. <br /> CltyoiCveret� I ;nl��.:. ; v � . �. �. ., . .. . n �u� ; �.�r � < �_ .. .. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.