My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11030 PAINE FIELD WAY 2016-01-01 MF Import
>
Address Records
>
PAINE FIELD WAY
>
11030
>
11030 PAINE FIELD WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:30:06 AM
Creation date
2/24/2017 9:30:01 AM
Metadata
Fields
Template:
Address Document
Street Name
PAINE FIELD WAY
Street Number
11030
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f � � <br /> k <br /> � , <br /> I <br /> DuM Le�kage Affid�vit � � � d��� 1 i <br /> I <br /> Permit#: � <br /> House address or lot number: IIO$D PG.�v�e F�e�� �A�u <br /> �O�' S � <br /> � � <br /> City: �ul.°/G'�' Zip: 20 <br /> Cond. Fioor Area(ft�): !"�!e}_ Source(circle one): Plans Estimated Measured <br /> ❑ Duct tightness testing is not required for this residence per exceptions listed at the end of this document <br /> Air Handler in conditioned space7 0 yes �no Air Handler presenl during test7 �yes� no <br /> Circle Test Method: leakage to Outside Total Leakage <br /> Maximum duct leakage: <br /> Post Construetion,total diset leakage: (floor area x.OS)=�CFM@25 Pa <br /> Post Construction, leaka��e to outdoors: (floor area x.O6)= CFM@25 Pa <br /> Rough•In,total duct leakage with air handler installed: (Aoor area x .O6)= CFM@25 Pa <br /> Rough•In,total duct leakage with air handler not Installed: (floor area x.04)= CFM@25 Pa <br /> Test Result: � CFM@25Pa <br /> Ring (circle one if applicable): Open 1 z 3 <br /> Duct Tesler Localion: iG�/� Pressure Tap Location: ��Q- <br /> I certify that these duct leakage rates are accurate and determined using standard duct testing protocol. <br /> CompanyName: Ccu�nPrrf6Ne �a�.45' Technician: R�5'�� �uAi <br /> Technician Signature: � Date: �2'/�20/( Phone Piumber. �72C-3$� •�U�f� <br /> Washington 5late Enerpy Code reference: � <br /> 507.10.J Sealing.Ati ducls,air handlers,filler boxes,and buildinp wvilies used as ducls shall be sealed.Joint�end seams shall camply <br /> with Seclion M7607.3 of lhe Inlernalional Residonfial Code or 603.9 ot the In(emafional Mechanical Code. Dud lightnass lesting shall be <br /> conducled to verify Ihal lhe ducts are sealed.A signed affidavit documenling lhe lest results shall be provided to the jurisdidion having <br /> aulhonly by lhe lesling agenl.When required by Ihe building ofGdal,lhe lest shall be conducted in Ihe presence ol department staH. <br /> Excep�ions: i.Dud lighlness lesl Is nol req:ired if Ihe air handler and all duds ara localed wllhin condilioned spaca. <br /> 2.Dud testing is nol required il lhe fumace is a nondired venl type cembustion appliance inslalled in an uand retum duclsa� <br /> A maximum of siz feel of conneded ductwork in the unconditioned space is allowed.All eddBional supply <br /> shall be vrithin Ihe conditioned spTce.Ducls oulside lhe condilioned space shall be sealed wilh e mestic type dud sealant and <br /> insulaled on�he ezterior vnlh R-B insulalion for above grade ducls and R-5 waler reslslenl Insulal'wn whan within e s'ab or <br /> � eaAh. <br />
The URL can be used to link to this page
Your browser does not support the video tag.