My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 PALM AVE 2016-01-01 MF Import
>
Address Records
>
PALM AVE
>
1401
>
1401 PALM AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:57:01 AM
Creation date
2/24/2017 9:56:44 AM
Metadata
Fields
Template:
Address Document
Street Name
PALM AVE
Street Number
1401
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PUBLIC W�RKS DEPAR7TifNT <br /> ' UfILITIES DIVISION <br /> . ���.'✓��/� � 3200 CEDAR STREF.T <br /> `/` ./� 3 EVERET'C, WASHiNCTON <br /> � L�/ COST ESTIMATE SHEGT <br /> Requested by Delta Pacific Construction ^.ori>. Date of Request 11-12-85 <br /> Charge Cost to (Name) <br /> Address p O. Bo>: 129 Kenmore l4A Zip 9802R <br /> Fund Utility ACC Program h'.0. p Assigned <br /> Installation Location Blliot way and Palm � <br /> H <br /> Installation t}7�e/description/size/etc. G" water ieed and hookvn � <br /> � <br /> I <br /> H H <br /> --- H '+7 <br /> Total Estin�ated Cost S1fl15.00 r, � <br /> � <br /> This estima[e reflects the Utilities Division having to Saw cut . . . . . . . . . . . . _ y� <br /> providc labor. equipment and materials to complete the Shoring . . . . . . . . . . . . _ � <br /> above mentioned installation including, but not limited Excavation . . . . . . . . . . . K I � <br /> to, the items identified to the right. Any labor and/or Backfill . . . . . . . . . . . . . := � <br /> equipment provided by the contractor to facilitate the Compaction . . . . . . . . . . S I <br /> M•ork by the City water department will be reflected in Temporary Patch . . . . _ I z <br /> a refund to the person making the deposit. Permanent Patch . . . . . .=• <br /> I � � <br /> Furnish double check valve assembly for <br /> temporary water supply . . . . . . . . . . . . . . . . ' p � <br /> Pinal hook-up after purity and '� <br /> pressure testing . . . . . . . . . . . . � <br /> H <br /> N <br /> (Hfi enever the estimated cost is not sufficient to cover the total expense for labor, � <br /> material, equipment rental and administrative costs, the deficit shall be charged to <br /> the property for which such installation was made and the oamer thereof, and provided � <br /> further, that any excess payment shall be returned to the person anPlying for the <br /> installation.) <br /> Itemized Cost Estimate: n / � <br /> Labor 6 Overhead 600.0o ilW,� ✓���✓/`� 259-a821 y� <br /> ri <br /> Material 620.00 Estimati Prepared By Don wahl Phone a � <br /> Eauipment Rental 495.G0 R <br /> Surface Restoration l00.0o cc: Larry Callahan <br /> [�7 <br /> TOTAL ESTI!'A7'L slel�.00 Don I'�citkam� <br /> Larry Crawford <br /> Bob Chervenell <br /> Clair Olivers <br />
The URL can be used to link to this page
Your browser does not support the video tag.