My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1405 PALM AVE 2016-01-01 MF Import
>
Address Records
>
PALM AVE
>
1405
>
1405 PALM AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:59:22 AM
Creation date
2/24/2017 9:59:17 AM
Metadata
Fields
Template:
Address Document
Street Name
PALM AVE
Street Number
1405
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WURKS DEPAR'[MENT <br /> lJl'ILITIES DIVISION <br /> 3200 CEDAR STREET <br /> EVERETT, MASHING7'ON <br /> COST ESTIMATE SHEET <br /> Requested by Delta Pacific Construction Coxp. Date of Request 11-12-85 <br /> Charge Cost to (Name) <br /> Addiess P O Hox 129 Kenmore. WA Zip 98028 <br /> Fund Utility ACC Program W.O. M Assigned � <br /> Installatian Location slliot wav and ralm n <br /> m <br /> Installation type/description/size/etc. 6" water feed and hookup •• <br /> H H <br /> �3 h7 <br /> Total Estimated Cost 51815.00 �' � <br /> This estimate reflects the Utilities Division having to Saw cut . . . . . . . . . . . . . ._ � <br /> provide labor, equipment and materials to complete the Shorine . . . . . . . . . . . . _ � <br /> above mentioned installation including, but not linited Excavation . . . . . . . . . . x � <br /> to, the items identified to the right. My labor and/or Backfill . . . . . . . . . . . . . x <br /> equipm.:�t provided by the contractor to facilitate the Compaction . . . . . . . . . . x � z <br /> work by the City water department will be reflected in Temporary Patch . . . . . _ <br /> a refund to the persor. making the deposit. Pexmanent Patch . . . . . X_ � � <br /> Furnish double check valve assembly for p � <br /> temporcry water supply . . . . . . . . . . . . . . . . � <br /> Final hook-up after purity and � <br /> H <br /> pressure testing . . . . . . . . . . . . �n <br /> (IYhenever the estimated cost is not sufficient to cover the total expense for labor, � <br /> material, equipment rental and administrative costs, the deficit shall be charged to � <br /> the property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation.) � <br /> Itemized Cost Estimate: /� /' <br /> Labor F, Overhead 600.0o OCA/�1 W �i/M__ 259-8821 � <br /> Material 620.00 Estimate Prepared By Don Wahl Phone M � <br /> H <br /> Equipment Rental 495.00 � <br /> Surface Restoration 100.0o cc: Larry Callahan <br /> TOTAL ESTIMATE S1815.00 Don IVeitkamp <br /> Larry Crawford <br /> Bob Chervenell <br /> Claii Olivers <br />
The URL can be used to link to this page
Your browser does not support the video tag.