My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2931 PANAVIEW BLVD 2016-01-01 MF Import
>
Address Records
>
PANAVIEW BLVD
>
2931
>
2931 PANAVIEW BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 10:50:05 AM
Creation date
2/24/2017 10:49:51 AM
Metadata
Fields
Template:
Address Document
Street Name
PANAVIEW BLVD
Street Number
2931
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� _ -- �- -%_ , <br /> INDUSTRIAL TES'i'ING <br /> P.O. Box 1501 <br /> Gf ���" Everett, Washington 98?A8 <br /> ��(i�2u� Telephone 208�259-0817 <br /> 12 September 1974 . �'/� /, c)��2H Aef: W-1048-E01 <br /> /" �� -� <br /> • � �� <br /> �G�u.�ct _----�/% `J <br /> • Hr, Chet Solie, Contractor <br /> 7514 Junlper Drive <br /> „ Sretett� Washington 98203 � <br /> Subjeet: Parcel B - Valley Viev <br /> 2931 Panaview Drive� fiverett, Waehington <br /> Dear Hr. Solie: <br /> Aa requestad, we performed a eoile investigation Chie date of the building <br /> conetruction eite located on Panaview Drive� Everett, Washington� ar.d found <br /> the folloaing eituatione: <br /> 1. The entire building foundation bed is on a 5 feet cut from the exiating <br /> ground eurface and ie of good foundation eoil material. <br /> 2. The preeent moieture eontent of the foundation soil is elightly above <br /> optim�. Before pouring concrete, the moieture content must be kept <br /> from plus or minue 12 pezcent, and the foimdation bed uniformly compacted � <br /> to prevent differential eettlementA. <br /> 3. The 61 inches of cut expoeed a good profile of the soil characterietics as " <br /> ehovn on the attached eoils log report. <br /> 4. The type of eoil found has an angle of internal friction of from 40 to <br /> 45 degreea. <br /> 5. Tha EBst and South aides of the propoeed building ie more than 20 feet from <br /> the edgee of the enbnnkment� vhich ie uafa ngainat landelidea; provided a <br /> good aurface and aubaurface drainage eyatem ie conetructed around the pro- <br /> • poeed building, srhich should be inspected prior to backfilling. <br /> From our eurficial eoila investigation, the type of aoil ve encounteted hno an <br /> allovable eoil preeeure of from 2000 to 4000 pounde per aquare foot �PSF). <br /> Hoping thie ie the information deeired, ve remain, <br /> Sincerely yours, P S q� <br /> INDUSTRIAL TESTING �J�oF WAsi���,�!�C <br /> ���e� ': �c'9 <br /> � �J " �},� Z r <br /> \i,..'-c.c -���G�-�.-�� <br /> /�ase A. Salonga��P. � ,�j ,r <br /> Civil Engineer � .p p c� <br /> ��F F�ISTE�� �t� <br /> � ('`d�"" <br /> cc: City of Everett Bui �i'h�4p� ent <br />
The URL can be used to link to this page
Your browser does not support the video tag.