My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/05/17 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/05/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:45:34 AM
Creation date
2/24/2017 11:44:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL PRELIMINARY AGENDA <br /> 6:30 P.M., WEDNESDAY, MAY 17, 2006 <br /> CITY COUNCIL CHAMBERS <br /> Roll Call <br /> Pledge of Allegiance <br /> Approval of Minutes: May 3, 2006 <br /> Mayor's Comments <br /> Council <br /> City Attorney <br /> Citizen Comments <br /> CONSENT ITEMS <br /> (1) Adopt Resolution # authorizing claims against the City of Everett in the amount <br /> of $1,052,925.15 for the period of April 29, 2006 through May 5, 2006 <br /> (2) Adopt Resolution # authorizing payroll claims against the City of Everett in the <br /> amount of $2,832,202.15 for the period ending April 29, 2006 <br /> ACTION ITEMS: (to be considered individually) <br /> (3) Award Bid 2006-836 for two (2) new replacement Boom Mowers, to Brim Tractor <br /> Company in the amount of $74,736.00 including Washington State Sales Tax <br /> (4) Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement <br /> with Brown & Caldwell to perform additional engineering services to design the new <br /> disinfection facility and provide assistance during bidding and construction activities in <br /> the amount of $116,070 <br /> (5) Authorize the Mayor to sign an Interlocal Agreement with Snohomish County for Light <br /> Detection and Ranging (LiDAR) airborne imagery data for enhancement of the of City <br /> of Everett GIS mapping system at a cost of $18,000 <br /> (6) Authorize the Mayor to sign the Year 2006 Public Works Trust Fund Construction Loan <br /> Contract-Everett Water Pollution Control Facility Improvements <br /> (7) Authorize the Mayor to sign Supplemental Agreement No. 3 with MWH Americas, Inc. <br /> to develop alternative design for Phase 6 of the Replacement of Water Transmission <br /> Lines 2 & 3 in the amount of $740,269 <br /> (8) Authorize the Mayor to sign Change Order No. 1 to the Residuals Sales Agreement <br /> with Series Seven Inc. D.B.A. Evergreen On-site for loading operations <br /> AGENDA CONTINUED ON THE BACK OF THIS PAGE <br /> >r <br />
The URL can be used to link to this page
Your browser does not support the video tag.