My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/05/17 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/05/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:45:34 AM
Creation date
2/24/2017 11:44:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> AMENDMENT NO. 1 <br /> CITY OF EVERETT <br /> DESIGN OF NEW SODIUM HYPOCHLORI 1"h FACILITIES FOR OF THE EVERETT WATER <br /> FILTRATION PLANT(EWFP) <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> The specific elements of the work in this Amendment No. 1 are subdivided into the following tasks: <br /> Task Title <br /> Task 501 Prepare Existing Base Mapping <br /> Task 502 Geotechnical Investigations <br /> Task 511 Civil Design <br /> Task 513* Structural/Architectural Design <br /> Task 514 Mechanical Design <br /> Task 515 Electrical Design <br /> Task 516 Instrumentation and Controls Design <br /> Task 550 Document Preparation and Bid Assistance <br /> Task 641** Geotechnical Review <br /> Task 671** PLC Programming <br /> Task 680 As-Built Documentation <br /> Task 710. Project Management <br /> *Task modified from original scope to include architectural design. <br /> **New task added for construction phase. <br /> The additional budget is based on one of the following scope changes. <br /> 1. 10%construction cost fee basis: The original budget was based on 10%of a Year 2003 <br /> construction cost estimate. The design effort was begun in 2004 and the facility described in the <br /> original Scope of Work is more extensive and includes more features than that upon which the <br /> 2003 cost estimate was based. <br /> a. Building foundation determined to require driven steel H-piles. <br /> b. Architectural features were defined to match those of the adjacent FWPS building. <br /> c. Metering system was changed to liquid V-notch feeders which require additional <br /> hydraulic design for the injectors. <br /> d. Building was laid out to support possible future conversion to chlorine ton cylinder <br /> storage. <br /> e. Metering room was separated from tank room and mechanical and electrical rooms <br /> were separated. <br /> f. Compressed air system was added. <br /> g. Storage tanks were increased to 11,000 gallon and day tanks were deleted. <br /> h. Detail of modification to existing utilities and site paving and grading were identified. <br /> Page 1 <br /> C:\Documents and Settings\pcornish\Local Settings\Temporary Internet Files\OLKF\Amendment 1- <br /> revi.doc <br /> • <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.