Laserfiche WebLink
4 <br /> hypochlorite building. In addition,a site walk through after the 90% submittal indicated that the <br /> handhole shown on the base map is not locate as shown. <br /> • (3)Redesign of building lighting plan from that submitted at 50%and 90%,creation of lighting <br /> zones,add power receptacles,change some lighting from fluorescent to HID with quartz in some <br /> fixtures,add motion sensors. Requires re-circuiting and calculations. <br /> • (3) Update one-line diagram. <br /> • Two additional site visits for final comment review and site condition verification. <br /> Task 516. Instrumentation Design <br /> Additional budget is added to this task to cover the additional design already completed through he response <br /> to the 90%comments as described in Progress Report 10 and to cover budget to complete the de sign from <br /> that point. <br /> • (2) HMI panel designed for harsh environment within metering room. <br /> • (2) Provide additional conduit in phone and fiber optic duct bank and route to barn near clearwell. <br /> • (2) Expanding fiber optic and phone to the FWPS building from the hypochlorite building. <br /> Task 550. Document Preparation and Bidding Assistance <br /> Additional budget is added to this task to cover the additional design already completed through the response <br /> to the 90% comments as described in Progress Report 10 and to cover budget to complete the design from <br /> that point. <br /> • (2) Increase in number of sheets from 58 to 88 and specification sections. <br /> • (2)Detailed construction sequencing to integrate with operating chlorine system and allow for divers <br /> in the clearwell and floc basin. <br /> Task 641. Geotechnical Review <br /> This task is added to provide geotechnical review services by HWA Geosciences during the installation of the <br /> test piles during construction (2). <br /> Task 671. PLC Programming <br /> Additional budget is added for TetraTech/KCM (ECS) to complete an estimated 100 hours of PLC <br /> programming(2). <br /> Task 680. As-Built Documentation <br /> Additional budget is provided to account for the increased sheet count and allow for expected complexities <br /> of the yard crossing with the new hypochlorite piping (2). <br /> Page 4 <br /> C:\Documents and Settings\pcornish\Local Settings\Temporary Internet Files\OLKF\Amendment 1- <br /> revi.doc <br />