Laserfiche WebLink
6 <br /> PUBLIC WORKS TRUST FUND D 1 crigg73 .17, <br /> ATTACHMENT 1: SCOPE OF WORK MAR <br /> 9 2006 <br /> LOAN NUMBER PW-06-691-014 �� <br /> b8c w©BIS B0"41)-kb <br /> s <br /> CLIENT NAME-CITY OF EVERETT <br /> PROJECT NAME-WATER POLLUTION CONTROL FACILITY EXPANSION-PHASE A <br /> 1. Provide a clear description of the project to be financed in part by a Public Works Trust Fund <br /> loan. (Attach additional sheets if necessary): <br /> Tasks included in the Phase A scope of work are design,permitting,construction management, <br /> performance verification and construction of the following elements: <br /> • Construction of two primary clarifiers <br /> • New biofilter for odor control of the primary clarifier gases <br /> • Piping for the primary clarifier biofilter <br /> • Headworks grit system improvements <br /> • Reconstruction of the trickling filter pump station <br /> • Modification of the existing trickling filters <br /> • New biofilter for odor control of trickling filter gases <br /> • Piping of the trickling filter biofilter <br /> • Primary sludge grit removal equipment <br /> • Replace chlorine gas with Sodium Hypochlorite System <br /> • Add new piping to increase flow routing flexibility <br /> • Sludge dispersion piping at aeration pond <br /> • Laboratory and operation room improvements <br /> • Add fixed discharge pump station at north effluent <br /> • Installation of new flow metering equipment <br /> 2. Identify the project's performance measures. (Attach additional sheets if necessary.) <br /> The completed project will be deemed a success when the plant meets its NPDES permit requirements by <br /> June 2009. <br /> 33 <br /> S:\MYun\WORD\PW TF2006\Scope_of_work2006 EW PC.doc <br />