Laserfiche WebLink
EXHIBIT A-3 <br /> SCOPE OF WORK • <br /> • Lateral capacity <br /> • Settlement performance <br /> • Corrosion potential <br /> • Construction considerations <br /> 2. Seismic design parameters for HDD and Transition Sections (ZZA) <br /> • Regional seismicity <br /> • Seismic hazard analyses <br /> • Site response analyses <br /> — Equivalent linear <br /> — Nonlinear <br /> • Liquefaction analyses <br /> • Ground deformation analyses <br /> — Vertical settlements <br /> — Horizontal displacements <br /> • Soil-pile interaction analyses <br /> • Impacts on pipeline <br /> — Ground shaking <br /> — Deformation(Relative and absolute) <br /> • Geotechnical parameters for use with UBC, as appropriate <br /> 3. HDD Section <br /> • Coordination of geotechnical issues between the two geotechnical design <br /> subconsultants. (ZZA and BSE) <br /> • Review alternative pile support platform for HDD drill rig located at the west <br /> transition section. (Z7A and BSE) <br /> • Conduct hydro fracture calculations for both pipelines to determine the <br /> minimum depth of cover required. (BSE) <br /> • Develop drilling procedures to mitigate wetland drillings impacts. Establish <br /> mitigation procedures for hydro fracture event to meet permitting agency <br /> requirements. (BSE) <br /> • Review and provide engineering design recommendations on the following <br /> items: drill rig thrust block design, deep conductor casing installation, pilot bore <br /> and ream drilling sequence for twin installations, steel pipe breakover and <br /> setback distances, hydraulic and pneumatic thrust assist, drill fluid pressure <br /> monitoring, steel pipe staging and welding requirements, steel pipe filling and <br /> testing. (BSE) <br /> 4. Buried Pipe Section (ZZA) <br /> • Temporary excavation slopes and shoring. <br /> • Construction dewatering <br /> • Foundation support including settlement estimates <br /> • Bedding and backfill <br /> • Corrosion potential <br /> • Construction considerations <br /> 53 <br /> MWH Page 13 EVERETT PHASE 6 HDD PROJECT <br /> 5/1/06 EXHIBIT A-3—SCOPE OF WORK <br />