Laserfiche WebLink
CL03SD CM PIORR ORDERS RBPORT � <br /> Total Utility Maintenance Management System <br /> 03/18/1996 Page 1 <br /> --- -____________________________________________________________________________ <br /> Date Range : O1/09/1989 - 03/07/1996 <br /> CM Work Order Range :1001091070001 - UT1002- - Pattern :7101196750633 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ________________________________________________________________________________ <br /> CM WORK ORDER ID: 7101196750633 Title: REPAIR 221 PECKS DR <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0184J029 -- WATER SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: 03/07/1996 <br /> Overall Craft : <br /> Issued: 03/OS/1996 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time : 0 . 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status : <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL SSJ SMITH, STEVE J. 0 . 00 4 . 00 59 .64 <br /> WST WDT WALDEN, DAROLD T. 0 . 00 4 . 00 79 .68 <br /> ---------- <br /> Total Labor Cost : 139 .32 <br /> Materiale: <br /> ID Deacription Date # Used Coat <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000147 ADAPTER 3/4" MIP X RI p 03/07/1996 1 2 .24 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 03/07/1996 2 15 .36 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 03/07/1996 1 12 . 96 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS " 03/07/1996 1 �,.7_fi�.. <br /> N/A METER JUMPER 03/07/1996 1 0 . 00 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 03/07/1996 �— 0.26 <br /> SETT34033647 SETTER COP 5/8" X 3/4" (H12") 03/07/1996 1 51.41 <br /> Total Material Cost : 83 . 99 <br /> Vehiclee: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD UNIT 4 . 00 22 .40 <br /> ---------- <br /> Total Vehicle Cost : 22 .40 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> BROKEN CURB STOP. INSTALL SETTER AND JUMPER <br /> Total cost for work order 7101196750633 : 245 .71 <br />