My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
223 PECKS DR 2016-01-01 MF Import
>
Address Records
>
PECKS DR
>
223
>
223 PECKS DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:58:29 AM
Creation date
2/24/2017 11:58:20 AM
Metadata
Fields
Template:
Address Document
Street Name
PECKS DR
Street Number
223
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C� �'0 <br /> In addtion the existing fill subgrade below the proposed slab on <br /> grade should be crowned to drain to the building perimeter prior <br /> to placing the recommended free draining structural fill <br /> subgrade. Penetrations should be provided in the foundations <br /> (above the footing subdrain) to all moisture from the slab • <br /> subgrade to drain to the perimeter drain system. <br /> Adequate positive drainage should be provided away from the <br /> structure to prevent water from ponding and to reduce <br /> percolation of water into the backfill. Granular backfill should <br /> be capped with paving or 12 inches of onsite silty soils. <br /> Planters and landscaped areas adjacent to the building perimeter <br /> should be designed to minimize water infiltration into the <br /> subsoils behind the basement walls. <br /> P� an Review <br /> This report has been prepared to aid in the evaluation of this <br /> site and to assist the architect, structural and civil engineers <br /> in the design and construction of the project. It is <br /> recommended that this office be provided the opportunity to <br /> review the final design and specifications to determine if the <br /> recommendations of this report have been properly implemented <br /> and to make any supplemental design recommendations which may be <br /> required. <br /> nhsP vations and Testina Durina Construction <br /> Foundation recommendations given in this report are based on the <br /> assumption that all foundations will be placed on undisturbed <br /> recommended bearing material. All footing and/or monolith <br /> excavations should be observed prior to placement of steel and <br /> concrete to see that footings are founded on satisfactory <br /> bearing materials and that excavations are free of loose and <br /> disturbed materials. All structural fill and backfill should be <br /> placed and compacted under observation and testing by a <br /> qualified testing laboratory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.