My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
616 PECKS DR 2018-01-01 MF Import
>
Address Records
>
PECKS DR
>
616
>
616 PECKS DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 9:09:17 AM
Creation date
2/24/2017 12:19:52 PM
Metadata
Fields
Template:
Address Document
Street Name
PECKS DR
Street Number
616
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> . '.1 -�� <br /> � � � . ' . . , <br /> INFORMATION FOR DEVELO?ER: <br /> �o � w � <br /> c � <br /> Y H N <br /> K � � 1. City streets and alleys are to be kept clear of dirt and debris <br /> ,otl � o� at all times during construction. Dust suppression and street <br /> N H cleaning must occur as directed by the Public Works Inspector. <br /> o � � 2. Performance guarantees are required for the curb, gutter and <br /> M � sidewalk. <br /> � , � <br /> � � 3. Permits must be outained for all fill removed from the site and <br /> N <br /> placed within the City limits. It takes about 35 days (a SE <br /> m review) to obtain permits for any specific site. There is <br /> � o m currently a lack of adequate permitted fill sites within the <br /> � � � City linits. <br /> �] y r <br /> O <br /> 4. A one-ye a r g u a r a n t e e i s r e q u i r e d o n t h e p u b l i c s t reet, utilit y <br /> and site landscaping tor an amount not less than 10� of the cost <br /> of construction and shall run for one year from the date of <br /> issuance of the first Occupancy Permit for the project. <br /> 5. A two-year guarantee is required for private retention/detention <br /> or other drainage treatment/abatement facilities serving areas <br /> larger than one acre. <br /> 6. On-site watermain will be staked within an easement to the City. <br /> The easement will be submitted to the City prior to the issuance <br /> of permits. <br /> /.. � <br /> � ��� 7. As-builts of storm sewer, sanitary sewer, and water systems will <br /> be required to be submitted per City design and construction <br /> � standards and specifications. <br /> �� <br /> '�� 8. GTE Northwest has facilities at this location. Any building <br /> entrances must be coordinated at least 60 days in ada�nce. <br /> Your contact at GTE Northwest is <br /> �'� for this building entrance. <br /> I �s <br /> 9 . Any required landscaping provided in the City right-of-way must <br /> be approved by the PuUlic Works Department and must_be lea�ed <br /> ��� frwn the City. <br /> , �I � 77 �(�oGt/J'T A�N�-y ro ��La�s�� <br /> , � 1-' <br /> . <br /> ��I 1. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.