Laserfiche WebLink
( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard t1601. <br /> � Connect side sewer per Cily Standard#'s 601,602, 604. <br /> G. Connecl all rooflop downspouts to the side sewer. <br /> � Connecl rooftop downspouts to the drainage system provided for tliis lot. <br /> 8. Roottop runoff must be discharged to a roo(downspoul infillration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet wilh the Public Works Inspeclor to discuss potential drainage rouling prior to <br /> beginning the project. <br /> 10. Install erosion conlrol measures as determined by the Pubiic Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everelt Slandards for small parcels <br /> 12. Remove erosion conlrol measures upon completion of Ihe project prior to final approval of the permit. <br /> 13 All excavated material(rom foundalion,sidewalk and driveways shali be hauled to an approved, <br /> permitled site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris lo be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to�e kept clean and open for <br /> pedestrian travel. <br /> 1 G. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gulter and sidewalk as per City of Everetl Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as direcled by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Inslall a Type I concrete driveway per Ciry of Everett Standard t1307. <br /> 19. Pave driveway from the front property lino out to lhe street paving. <br /> 20. Conlact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 wilh a oas lrap per Standard Plan #410 is required(or the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhote,then <br /> graviry flow across the public right-of-way. <br /> 23. A sprinkler system is required for lhis building in compiiance with the requirements oi NfDA Standards <br /> 13D. <br /> PWComments � <br />