My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 PIGEON CREEK RD 2016-01-01 MF Import
>
Address Records
>
PIGEON CREEK RD
>
3500
>
3500 PIGEON CREEK RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 12:36:15 PM
Creation date
2/24/2017 12:36:10 PM
Metadata
Fields
Template:
Address Document
Street Name
PIGEON CREEK RD
Street Number
3500
Notes
#1 RD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � �. . <br /> ''1' <br /> F. Metro - Seattle, Washington - Juanita Pump Station <br /> (3) 250 HP pump system. Started and accepted in April, 1984. <br /> G. Seattle, Washington - Ve[erans Hospital <br /> (2) 50 HP chill water pumps. Started and accepr.ed in February, 1984. <br /> H. Bellevue, Washington - Pacific Northwest Bell T.uilding <br /> 15 HP chill water pump syatem. Scarted and ac:epted in May 1984. <br /> I. Metro - Seattle Area - Kenmore Pump�Station <br /> (2) 125 HP, accepted and presently being buil[. <br /> .1. MeCro - Renton Area <br /> i <br /> � (32) 20 and 30 HP RAS pumps, Accep[ed and scheduled for shipment in <br /> Sep[ember, 1984. Engineered by Brown and Caldwell / R. W, Beck. <br /> K. Bellingham, Washington <br /> (2) 40 HP constant pressure uater pumps. Shipped ar.d accepted in May, 1984. <br /> L. Pierce County, WashinF[on <br /> 40� HP dual simplex system. Approval drawings accepted and received back, <br /> May, 1984. <br /> M. Hanford, Washington - Nuclear Reaction Section <br /> (2) 40 NP high performance drives. Started and accepted in March, 1984. <br /> We also have several wa[er and sewage systems running in the States of Alaska <br /> and Oregon. <br /> Theae systems are all built per engineered specificationa done by conaultants <br /> and are one of a kind systems. IJe strive to use all UL components (where there <br /> are UL components), and built to N.E.C., OSHA, and state codes, <br /> We hope this answers your questions and concerns. If you have anything further, <br /> please do not hesitate to contact us. <br /> Sincerely, <br /> U ,� <br /> ��,,��. J �;��•��<<� <br /> George� Kole- <br /> Robicon Corp. Representative <br />
The URL can be used to link to this page
Your browser does not support the video tag.