My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 PIGEON CREEK RD 2016-01-01 MF Import
>
Address Records
>
PIGEON CREEK RD
>
3500
>
3500 PIGEON CREEK RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 12:36:15 PM
Creation date
2/24/2017 12:36:10 PM
Metadata
Fields
Template:
Address Document
Street Name
PIGEON CREEK RD
Street Number
3500
Notes
#1 RD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ' . <br /> ENGINEERING S?ECIFICATIONS <br /> :63. ELECPRICAI.: � <br /> � Sco : • . <br /> The Contractor shall furnish and install a complete electrical systein for <br /> lighting, power, venting, heating, telephone, telemetering control ap- <br /> paratus and instrumentation as shown on the Plans and indicated herein. <br /> The work shall include completion of minor details of electrical work, <br /> not specifically mentioned or shown, as necessary for the successful <br /> operation of thr electrical system. Ali work shall be installed � <br /> � in accordan:;e �.�ith tiie latest provisions of the 1981 NEC, UL 98, and <br /> interim amendments in •�ffect at the time of Contract and the City, � <br /> County, and State Electrical Codes and Ordinance requirements. All ' <br /> materials shall be new and shall bear inspection labels of the j <br /> y National Board of Fire Undezwriters. The Contractor shall furnish <br /> the Er.gineez a certificate of final inspection and approval from the <br /> local and state authority having jurisdiction over this installation and <br /> upon the.completion of the work, the Contractor shall conduct an opez- <br /> ating test of all equipment, for approval. When fuses are used, there <br /> shall be three (3) extra fuses left with the Owner for each fusable <br /> switch or cut-out. � <br /> }� it shall be the responsibility of the Contractor to coordinate the power � +' � <br /> j` requirements, control require�nents and necessary electrical connections ; ( <br /> ,� d' for the various pieces of equipment to be installed under this Contract. � ' <br /> L � <br /> z • <br /> ; The Contractorshall furnish and install the electrical lighting specified <br /> � on the Drawings complete with lamps and bulbs, and shall replace all lamps <br /> and bulbs upon failure, up to date of job acceptance by the City. <br /> - , <br /> � <br /> Any equipment that does not have a UL, FM, CSA or other approved testing <br /> iaboratory label shall be furnished with a notarized letter signed by the � , <br /> supplier stating that the equipment furnished has been manufactured i ' <br /> in accordance with the National Electric Code and oSHA requirements, <br /> and that it has been accepted for use in the State of Washington. <br /> Telephone S Telelneter Service � �; <br /> Telephone and telelneter service shall be supplied and i�stalled at the � �+ <br /> structures and otiherooirts as indicated on the Drawings. Any aerial ; _ <br /> installation shall be only on power poles to be installed by the PUD. ; � <br /> Delivery fran poles to structures and other points shall be underground in <br /> conduits. `{ <br /> i(', <br /> Electrical Service: � ��� <br /> Service to the structures shall be 277/480 volt, three-phase, 60-cycle, ` <br /> 4-wire, as shown on the Drawings and indicated herein. i <br /> The Contractor shall arrange for the power company (Snohomish County PUD f') <br /> No. 1) to provide electrical service from the new power poles to be erected � ! <br /> on the site by the PUD to the four (4) separate service connections as shown EE <br /> on the Drawings. <br /> I�, <br /> 63-1 !� <br />
The URL can be used to link to this page
Your browser does not support the video tag.