` ^ ._.• ./ � ♦ � I �. ' ., . . �
<br /> �15• ❑ Wire in and inst:�ll new complete three•way switch controlled lir,ht fixture(s) for
<br /> 46. p Install new No. 10 �;�iring betwecn srr�ice panel and hot w�ier ho�ter. ( �, Sre plumbing seclion for clian�es in lo-
<br /> cation.
<br /> 47. �Remove ancl blodc �rr w,used w��;n�;a
<br /> 48. �Replace all non-code and sub-slandarcl wirin; (includes �.ervice panel wirin� an_c{r.ircuils). Inslall 'unction boxes a�
<br /> n�cess'ary to cumply with code._Cl�e�v��4��e-_w��(u'�.�.�.�n,r.), 1
<br /> �9. �Q,Remove all "zip" COIC�Wlllfll;.
<br /> 50. P{;Replace missing �I�ss portions of linht fixlur�s (or�fn�� �i-i= l�t:nf�in{1,5
<br /> 5L pQ Insl. 11 n�w complete li;;ht (i>:lwe(s) for-�g��FiV(=lA����Si1�'L''S=�'_� � - _L�_ 1_Lilv
<br /> �1t��S��rGJic�n1_St_«.�nlL� CZ-_rior;tt�t1�,, r- ,ur,y�/�n.-,�-`-lr-{=���r�R�I�7�}
<br /> S1£�`ulLrl-1�LL�nt`[_l3��T tl�-cL�T_1iC���2c��z �`
<br /> 52. �Replace doorhell chimes and repair (�r P��P�'� ��P�'��lion. �QReplace doorhell button(s).
<br /> 53. �Repl:�ce all missir�g, dam�ged, ob�ole�e or p��inted ouUels, r.ovcrs, S'.VI(CIICS, phles and li�ht globes.
<br /> E4. ❑ Clean,oi!, ind rep�ir e>;haust fins (cr
<br /> 55. ❑ Recomn�endaticns only. See conht,cting ar;ent for channes in healing specifica�ions (if any),
<br /> 56. ❑ Remove ❑ exislin;; furn,ce, [�� cil storage tanl<, f � supply lines, [; �n�iring, � � ;iiermostat. [] Cap off unused
<br /> chimney. f� Wi e in and install rer� complete electric baseboard he:�ters to all roums. Ilealers to be of sufficient
<br /> capocitv to main ain ,i hoat rsn�;e of 70" insid� (�t a poinl 3' abuve (loor in all habitable rooms) at 15° outside �vithcut
<br /> overloading or scorching walls. No unit tu br less Ihan h' per 1000 watls. Thermostats to be localed on inside
<br /> tvalis. Fleating units to be insulalecl against heat loss if inslallation is upon conciete.
<br /> 57. �Rernove trash ar.d dc6ris of nialeri;ils and worlunanship.
<br /> 58. ❑ Ascer[ain with contracting �Fant thot an electric (urnace will he installed before submitting bid. If so, provide
<br /> necessary line voltae;e sinvica to and connect �vith elechic furnace.
<br /> 59. �Miscellaneoiis: �"1t12L';�.e.✓ l�Lii� =Lc[7 l:�eT2��r{(,rC otJT[=�
<br /> HEATING
<br /> NOTE: Cmitractor to repair all npenings left as a result of heatingsystem clianges.
<br /> Exi;ting hcat is n�L r-'c.L�[�C1�L�cYA<-L .
<br /> G0. [J Furnace report to folloo�.
<br /> 61. �;Recommendations only. See contractin� agent for chan�;es in heating specifications (i( any).
<br /> 62, �Q Remove existing hcatin� system and all components.
<br /> 63. ❑ Install a ne�v �1 15 !CW ❑ 20 ICuV . . , eler.tric furnace as per local codes. Purnar.e to be [� upright ❑ counterflow
<br /> [) horizontaL [) To include controls, lhermost.it, ducts and re�;isters to all rooms except
<br /> Locate furnoce
<br /> ❑ Cap off imused chimney.
<br /> GA. ❑ Install a ne�1� complete forced ivarm air gas fircd furnoce to include wiring, controls, ihermostat, smoke pipe, ras
<br /> supply and ducts �vith regi=ters to all ronms except , Fire test for pro�>er
<br /> operation. Nrtv he,iting svsinm in h�� of ciufici�nt capac.t, 'o m�ir,:.�in a he,�t i'a;;g,: ui i0 inside (at ;t point 3� ❑i�ove
<br /> iloor in aL' habitable rooms) at 15 outsidc without overloadinc;. � i G85 COI71�7�117� to install gas lines and meter to
<br /> d:vclling. '-
<br /> 65. �f InStall a new complete oil forced aann aii oo�ver hurner furnar.e to indude �,viring, controls, thennostat, smolce pipe
<br /> and ducls �vith re,;isters tu all ronmsf,�,.i . Pire tesl for uruper
<br /> operation. Mew he�ting system i� be of suf(icienl capacity to maintnin a lieat range of 70' inside (at a point 3'
<br /> above (loor in all h�bilablc rooms) at 15� oulsidc �mithout ovcrloading.
<br /> 66. � Existing duct �vork may be ulilir.ed �vhere possible with proper adaptations. Duc(s must.conform to new furnace c�-
<br /> picit� Provide s�d(icient retiun �ir.
<br /> G7. ❑ Insulate all warm air ducts located in crawl spaces.
<br /> 68. ❑ Instnll a new undcr;rnund oiI slor:i�;c tanl< to include vent and oil lines. Hool; up �•iifh furnirc hurncr.
<br /> 69. [� Install a 275 gallon above ��round oil stoiai�e t�nl; ivilh oil suppl}�ancl n�turn linc;.
<br /> 70. � Remove trasli and debris of m;,tcri.ils and �vorlcrianship.
<br /> MISC[LLANEOUS
<br /> 71, rj � Instill � Replace . . . attic areess door in
<br /> 72. ❑ Install a;lditional rock tvool attir insnlition for a (ot�l overill cnw r;r.,�� ul G".
<br /> 73. L� Install under (loor insul�tion of 2' I;alts (aluminum (oil one s41e1 ;�tt�ched to joist boltoms only. Cnwl sp�ce w�rts
<br /> to remain (ree flowin�; lo ci��;�l ��iace (Diat�,nm :+vriilable �t brol�ers' of(ices).
<br /> 74. �Point up chimncy bricl<s ancl rc(inish cap,
<br /> 75. � Install };,�ltic vents in '}�;�bles [i roof.
<br /> 76. �� Rep.;iNmploce fireplace damper. Repair firepl�ce ;"! [I facing n hc,irth.
<br /> 77. �( Rr�i;ove trash and dcbris cf mntcrials and �vorl<manship.
<br /> INFORMATIONAL NOTATIONS
<br /> ❑ Estimated costs do not indude carpentry, Irryout or design diaF�ram lo iccommodate �
<br /> � I heitin�; � i e;atcr h��:ilcr . . . f�cility chanc.o(sl.
<br /> ❑ Corrections lo floor elevations tvould result in exlonsive dann�;e to upper i;�olls, etc.
<br /> I�{ Roof life expectonc� is�`IiMQ���t , plwnbin� iswinterized.
<br /> b.; A;tic is insulatc�d �vith� -E G " _Oc L�4iZpn�., . Flc�t is)� c'f � � un.
<br /> ❑ Natcr heater bclong; to Gas Co. l4�alcr is f �n �;,O�f• �('I,UM(iini6-
<br /> ❑ Space heaten c�lonE;s to Gos Co. L-E..aKs�,
<br /> ❑ Fumocc hurncr 6elungs to �t�['j� � �e�(�('1'CC�
<br /> ❑ Watcn c�iter is rented Rom j �
<br /> pQ,Service p�nel capacity_14� Ar-tp 514 Noitheast 165th Street
<br /> ❑ 69iscellancous Scattle, Washington 9J15:i
<br /> EM 4-1731
<br />
|