Laserfiche WebLink
�S� � �� o�� �� 3 <br /> Total Utility Maintenance Nanaqement System <br /> _ 01/02/1998 Page 1 <br /> =��-:�:� �—_ -�=�:==a:�=�---Q��a� <br /> Date Ranqe :O1/09/1989 - 01/01/1998 <br /> Qi Work Order Range :0830800810000 - (JT2830-30-322Pattern :7101196751323 <br /> Item Ranqe :<Blank> - WVL3694L05 Pattern :* <br /> Proqraa: ALL Function Ai.i, ?,ctivity AI,L <br /> ___��_���__—�_____________=_=�---_-�_--_--------_------ ------- <br /> --- -- ------------- ------�-------- <br /> � �10RIC URDER ID: 7101196751323 Title: CONVERT 1013 PINE ST <br /> «DUPLIC?,TE FRINTING OF THIS WORK ORDER» <br /> Item ID: WS1�95G013 -- WtiTER SERVICE <br /> Location ID: __ <br /> Proqram 710 Function 119 Activity 675 <br /> Date Completed: 12/22/1997 <br /> Overall Craft: <br /> Issued: 12/19/1997 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Doamtime: o hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> -- ------ ------------------------------ <br /> -------0.00 ------6.00 ----114.90 <br /> WST TDE1 THOMPSON, DW?,YNE E. <br /> Z7I+ WTE WESTVANG, TERRY E. 0.00 6.00 94.68 <br /> Total Labor Cost: 209.58 <br /> 1(aterials: <br /> I� Description Date ,� Used <br /> ------------ ------------------------------ Cost <br /> -------- -------- ---------- <br /> 14D1►P34000547 2�pAPTER 3/4" MIP X INSTA-TITE@ 12/22/1997 2 16.86 <br /> .�DAP34145347 ADAP'PER 3/4°MIP X 1°IpS INSTA@ 12/22/1997 1 10.62 <br /> ADAP34150�4� 11DAPTER 3/4" MIP X 1^ IPS RI @ 12/22/1997 1 <br /> BOX000056247 BOX tiETER PLA 15� X 10" W/LID 12/22/1997 1 12.94 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 12/22/1997 1 30.67 <br /> NIPP34131247 NIPPLE 3/4" CLOSE BRASS ^ 12/22/1997 1 0.78 <br /> SETT34I46547 SETTER COP 5/8° X 3/4" (H9") 12/22/1997 1 <br /> 41.41 <br /> Total ltaterial Cost: 118.59 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ---------- ------------------- <br /> ----------- ------ ---------- <br /> VJ0026 '97 FORD 1 TON SVC TRUCK <br /> 6.00 35.40 <br /> Total Vehicle Cost: 35.40 <br /> work Description: <br /> ---------------------------------------------------------- <br /> METER ,f41508058 ----'---""-"----- <br /> Total cost for work order 7101196751323: 363 57 <br />