My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2110 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2110
>
2110 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 1:38:57 PM
Creation date
2/24/2017 1:38:48 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; REPAIR SPECIFICATIONS AND LIST OP WORR TO BE BID <br /> „ r <br /> , • Page - . •' r �:. <br /> Address: ! � <br /> 1• Foundation Adjust posts supporting center beam in <br /> house tc the same level as outside foundation walls. <br /> Replace any posts in contact with ditt and replace post <br /> supports with 12" x 12" pier blocks where support does <br /> not extend above grade. - <br /> $ / 75. 0� <br /> 2. Roof Teat off existing house roofing complete <br /> including garage. Install new 1/2" CUX plywood <br /> sheathing over entire house roof. Install 151► asphalt <br /> impregnated felt over plywood. Install anodized metal <br /> drip flashing at eaves and rakes. Replace chimney ~ <br /> flashings, pointed into mortar joints. Install 220i� 1•�� <br /> fiberglass composition shingles over house roof in <br /> accordance with manufacturer 's installation <br /> instructions. Install selvage edge roll coofing over <br /> garaqe roof. Owner choice of roofing color. <br /> $ o? Ce50 , 00 <br /> 3. Gutters Tear off existing gutters and downspouts on <br /> house complete. Install new 1 x 6 tight knot fir facia <br /> on all eaves, (painted before installation of gutters) . <br /> Install new continuous aluminum 'R' style gutters and <br /> matching downspouts on all eaves. Secure gutters 48" <br /> .O.C. into rafter tails and install to slope to <br /> downspouts. Secure downspouts at top, bottom and at all <br /> joints, Provide splashblocks at downspouts. Owner <br /> choice of gutter color. <br /> $ S� 5, o0 <br /> 4. Exterior Paint Wash and scrape all loose paint from <br /> extezior house trim. Paint trim, two coats, owner <br /> choice of color, including front and back doors. Prime <br /> and paint garage, owner choice of color. All exterior <br /> paint : oil base. Apply oil primer and Ewo coats oil <br /> base deck paint to front porch deck� owner choice of <br /> color . <br /> a" � SD . ao <br /> 5.� Front Porch Tear up exis�ing deck material and <br /> �oist'—' s on front porch complete. Install n�w 2 x 10 <br /> joists. Replace deck with new boards, tonque and <br /> 9roove, same dimensions as existing. Trim out perimeter <br /> with new quarter-round. <br /> $ Y95. �o <br /> 6. insulation Blow in new cellulosic or fiberglass <br /> insulation in all exterior wall cavities from the inside <br /> of the house. Dtill minimum two holes per full length <br /> cavity. Plug and patch holes flush �with wall surfaces <br /> not to receive new wallboard. Blow in loose fiberglass <br /> in attic into channels between existing insulation to <br /> the level of the existi.zg' insulation. <br /> . � s 79 �. " <br />
The URL can be used to link to this page
Your browser does not support the video tag.