My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2110 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2110
>
2110 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 1:38:57 PM
Creation date
2/24/2017 1:38:48 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. REPAIR SPECIFICATIONS AND LIST OF WORK TO PE BSD <br /> � <br /> . Paqe _: . �7 _. <br /> Addresa: -� . ; ' ' <br /> install new one or three piece laminate tub surround to <br /> replace existing surround in bathroom. Prepare <br /> underlayment surface as necessary to accept new <br /> surround. Glue both surfaces. Caulk all joints and - <br /> trim edges with aluminum laminate trim. Owner choice of <br /> � color of laminate. <br /> install new tempered glass shower door in bathroom. <br /> Material allowance : $100 for shower door , owner choice <br /> of style. Install in accordance with manufacturer' s <br /> instructions. <br /> install owner 's surface mounted -�edicine cabinet in __,� <br /> bathroom over lavatory. <br /> Install two custom made doors over closet next to <br /> bathtub. Paint new doors and existing shelves, two <br /> coats semi-gloss latex, (same as trim paint. ) include <br /> hinges, latches and knobs. Trim out as necessary. <br /> Remove existing closet rods and shelves in each bedruom <br /> closet and install new rod and shelves to run <br /> north-south. Paint shelves with interior trim paint. <br /> She1VeS : 1/2" AC plywood. <br /> Install clothes dryer vent out house to code. <br /> Fill chimney flue opening in living room with insulation <br /> prior to installation of gwb. Cap chimney at roof. <br /> $ 6 76', °' <br /> 11. Plumbin All new plumbing work called for in this <br /> item : in accordance with the National Plumbing Code, <br /> 1979 editiun. <br /> install new copper service plumbing from house to street <br /> including all valves and connectors as necessary. <br /> Replace existing tub nozzle with new chrome plated <br /> nozzle. <br /> install new 33" stainless steel kitchen sink, min. <br /> 7-1/4" deep, double basin. Install new sin9le lever <br /> washerless faucet and sprayet hose, Delta or equal. <br /> $ !o O S. "� <br /> 12. .Electrical All new electrical work called for in <br /> thi—s em : in accordance with the National Electrical <br /> Code, 1981 edition. <br /> Install new 200 amp electric bceaker service panel, <br /> Square D or equal, including mast and all other <br /> necessary hook-ups. Label and cDnsolidate all <br /> circuits. Install at same location as existing. <br /> Replace all existinq house wiring complete except wiring <br /> . to existing electric heaters, electric range and hot <br /> aater tank. <br /> Install new bathroom exhaust fan on wall switch (inside <br /> � bathroom door) . Exhaust out house to code. Material <br /> allowance for fan : $30.00. � <br /> • -.,-�__,_m,�... . _... ....-___- ._ .. ._.._. _,. <br /> -..-�- . , _ --:�—_;,_ ....... . . . . .. ...._-- _ -, <br />
The URL can be used to link to this page
Your browser does not support the video tag.