My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2327 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2327
>
2327 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:12:56 PM
Creation date
2/24/2017 2:12:50 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2327
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. TO POSTING �T 12 1998 3 <br /> CLOBED pI 1fORE ORDERB REPORT <br /> Total Utility Maintenance Management System <br /> 10/22/1997 Paqe 1 <br /> ------------- ---------------------- <br /> -------------�________________________________----------------------___________- <br /> Date Range :O1/09/1989 - 10/09/1997 <br /> CM Work Order Range : 1001091070001 - UT0021-35- Pattern :7101196649453 <br /> item Range :<Blank> - WVL3694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> e===c=va_=vs_ 'veeveeeec_e= c_e==e_=-c_-e===_c===___---=--c=_ec==_-c==c====______ <br /> CM WORK ORDER ID: 7101196649453 Title: SO .75 INCH 2227 PINE ST <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function 119 Activity 664 <br /> Date Completed: 09/08/1997 <br /> overall Craft: <br /> Issued: 07/22/1997 issued by: Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL CSG CAVANAH, SHANE G. 0.00 2.50 35.33 <br /> UL DMJ DOUCETTE� MARK J 0.00 2.50 39.45 <br /> Total Labor Cost: 74.78 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 09/OB/1997 1 8.38 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 09/08/1997 1 12.94 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 09/08/1997 1 15.34 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 09/08/1997 1 30.67 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 09/08/1997 1 0. 19 <br /> SADD44016847 SERVICE SADDLE 6" W/3/4" CCT 09/08/1997 1 12.01 <br /> SETT34033647 SETTER COP 5/8" X 3/4° (H12°) 09/08/1997 1 52.31 <br /> Total Material Cost: 131.84 <br /> �►ehiclaa: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- I <br /> V2117 91 CHEV 1-TON HYD UNIT 2.50 13.25 I <br /> VH0003 94 CAT SACKHOE 2.50 60.50 <br /> Total Vehicle Cost: 73.75 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER #41908298 <br /> 2 'RIGHT OF LEFT AND 40' OUT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.