My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2507 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2507
>
2507 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:29:57 PM
Creation date
2/24/2017 2:29:49 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2507
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> � PUBLIC WORKS �a�Q 12/23/2002 / <br /> PERMIT PublicWorksPermitN PWo�12-034 <br /> Building Permit N CO212-026 <br /> PUBLIC WORKS OEPARTMENT Planning Referenc^ a <br /> 3200 Cedar Strcet <br /> Evoretl,WA 98201 Public Works Fee 5 $2g. 00 <br /> (425)257�0 POSTING�uN o z zoo� Guarantec S <br /> OWNER NAME THEO CONSTRUCTION INC ANDLADDR[SSME <br /> AN�ADDRESS: . <br /> PO BOX 3065 <br /> BOTHELL WA 98041 <br /> P"oNE: q254867643 PHONE: <br /> TAXPARCELI.�.� 2��90540330001 P�UJECTADDRESS: 2SO�I PINE ST <br /> DESCRIPTIONOF �W H�USE - SELCO BJISIC 2146 <br /> PROPOSED WORK: <br /> PERMIT CONDI710N5 LOT 2 OF SHORT PLAT <br /> 1202-27-01 <br /> 1. All calls lor inspection shall be made 24 hours in advance- phone(425)257-8810 <br /> 2. All work shall be performed in accordance wilh this permit and current City of Everett Design and Construction <br /> Standards and Specificalions. <br /> 3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br /> W <br /> 4. Connect side sewer per City Standard �' s 601, 602, 604. � <br /> 5. Connect all rooftop dovmspouts to the side sewer. y� <br /> 6 . Install erosion control measures per City of Everett Standards for W <br /> small parcels O <br /> 7. Remove erosion control measures upon completion of the project prior ' <br /> to final approval of the permit. ^ � <br /> ,. <br /> S. all excavated material from foundation, sidewalk and'dciveWays shall O <br /> be hauled to an approved, permitted site. No wastinq of material is <br /> allowed on this building lot. " '�A <br /> V/ <br /> � _,,� � <br /> � 03�1O3�� � <br /> ::!JE� '0. <br /> �' ;-':_ --,-_ . <br /> i - .- _ <br /> ACKNOWLEDGEMENTOF CONDITIONS <br /> � The undersigned owner/applicant huroby agrees to hold and <br /> � D�, save harmiess the Ciry of Everett irom any and al�claims for <br /> pprov i Cons� iion aie damages.costs,expenses,or causes of action that may arise <br /> // / because of installation and maintenance of the improvement or <br /> �/ �' �_�3 olher rightof-way use herelo applied for and further agrees to <br /> !r � � -� romove same upon ootice trom the Ciry and ro repiace public <br /> FINAL INSPECTION pro erty dam ed thereb . <br /> Approved as ConstmctM Date <br /> � _ ,.:-S _ �-\�-�� <br /> igna ie ol ApplicaN Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 18D DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION.THIS PEFMIT MAY BE CANCELLED BY TNE CIiY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.